Poelaert Elevators
Poelaert Elevators | |
---|---|
Alternative names | Ascenseurs des Marolles (French) Liften van de Marollen (Dutch) |
General information | |
Location | Marollen |
Town or city | City of Brussels |
Country | Belgium |
Coordinates | 50°50′16.9″N 4°21′04″E / 50.838028°N 4.35111°E |
Inaugurated | June 2002 |
Renovated | 2021 |
Cost | 78 million Belgian francs |
Owner | STIB/MIVB |
Height | 27.7 m (91 ft) |
Technical details | |
Lifts/elevators | 2 |
Design and construction | |
Architect(s) | Patrice Neirinck |
Architecture firm | AVA Architects |
Main contractor | CFE |
Renovating team | |
Structural engineer | Van Eycken Metal Construction |
Other information | |
Seating capacity | 32 |
The Poelaert Elevators (French: Ascenseurs Poelaert; Dutch: Poelaertliften),[1][2] in popular language Elevators of the Marolles (French: Ascenseurs des Marolles,[3][4] Dutch: Liften van de Marollen[5]) is a public elevator in the Marolles/Marollen district of Brussels, Belgium. It connects the lower and upper town at the Square Breughel l'Ancien/Breughel de Oudeplein with the Place Poelaert/Poelaertplein,[1] in the vicinity of the Palace of Justice. The elevator consists of two independent elevators, hence the plural elevators (French: ascenseurs, Dutch: liften) sometimes used for its name.
Construction
[edit]The idea of building a means of transport connecting the Marolles/Marollen neighbourhood and the Place Poelaert/Poelaertplein is much older; in the 19th century, it was proposed to build a funicular for this purpose.[3] In the early 1990s, the architect Patrice Neirinck of AVA Architects promoted the concept of building a vertical elevator.[6] The proposal sought to "open up the Marolles district" and "revitalise the Square Breughel l'Ancien/Breughel de Oudeplein",[7] located at the bottom, making it a crossing point.[6]
CFE was appointed as the general contractor, and the supply of the two elevators and the electromechanical systems were provided by Schindler Group.[1] The architectural project was executed by the AVA Architects office, under the coordination of the architect Patrice Neirinck, while the Verdeyen & Moenaert took care of the stability study.[3]
The construction cost about 78 million Belgian francs (equivalent to about €2 million),[6] of which 51 million francs (about €1.25 million) for the bulk of the investment, and 27 million francs (about €676,000) for the elevators. Funding was provided by the Brussels-Capital Region and the Belgian Federal Government under a cooperation agreement. The Ministry of Communications and Infrastructure was in charge of the project management, receiving technical assistance from the Directorate of Electromechanical Constructions.[3]
After the construction of the tower, the future metal walkway was installed between the upper part and the Place Poelaert. The 36-metre-long (118 ft) walkway was made at Geel, Antwerp, and transported to Brussels by a special convoy, arriving on the esplanade at the Palace of Justice around 10:00 on 13 October 2001.[3] The entire lift was inaugurated in June 2002[6] and became one of the area's most popular tourist attractions.[8] Its administration and operation was entrusted by the municipality to the Brussels Intercommunal Transport Company (STIB/MIVB).[4][3]
Operation
[edit]The operation of the new elevator was marked by numerous technical problems,[9] the first being reported only one month after the inauguration, on 21 July 2002.[10] In 2019, for example, STIB/MIVB had to intervene a total of 131 times to remedy the faults that occurred at the two elevators: 43 wedges in one of them, 88 wedges in the other. The main reasons that led to the shutdown of the elevators were the unfavorable weather conditions and vandalism.[4]
In April 2018, 1,300 colored T-shirts were hung from the structure of the elevator, as part of the work entitled If I Had Wings, a cultural experiment by Finnish artist Kaarina Kaikkonen.[5]
In July 2020, the Minister for Mobility and Public Works of the Brussels-Capital Region, Elke Van den Brandt, confirmed that the lift would be rehabilitated in the first quarter of 2021.[4]
About a million people use the elevator every year.[6]
-
View from the base of the elevator
-
The metal walkway leading to the elevator
-
View from the Place Poelaert/Poelaertplein
Specifications
[edit]The Poelaert Elevators have the following specifications:[6]
Specifications | |
---|---|
Characteristics | Value |
Number of elevators | 2 |
Height | 27.70 m |
Walkway length | 35.50 m |
Total weight | 100 t |
Max load | 1,250 kg (16 people per cabin) |
Speed | 1 m/s |
References
[edit]Notes
[edit]- ^ a b c "staal_acier_05" (PDF).
- ^ "Constructie van de Poelaertliften". Beliris (in Dutch). Retrieved 19 June 2021.
- ^ a b c d e f "Bruxelles La passerelle de l'ascenseur des Marolles est arrivée samedi Réconcilier le haut et le bas de la ville MODE D'EMPLOI". Le Soir Plus (in French). 15 October 2001. Retrieved 19 June 2021.
- ^ a b c d "Les ascenseurs des Marolles seront rénovés en 2021". BX1 (in French). 7 July 2020. Retrieved 19 June 2021.
- ^ a b "Lift Marollen in nieuw kleedje". www.bruzz.be (in Dutch). Retrieved 19 June 2021.
- ^ a b c d e f "Un ascenseur pour faire revivre la gare de Jonfosse ?". www.schreuer.org (in French). Archived from the original on 28 June 2021. Retrieved 19 June 2021.
- ^ "ARCHI URBAIN (02/26) : AVA / Ascenseur Place Poelaert – ARCHI URBAIN" (in French). 22 March 2008. Retrieved 19 June 2021.
- ^ "Les Marolles".
- ^ "Lift tussen Marollen en het Poelaertplein in panne". www.bruzz.be (in Dutch). Retrieved 19 June 2021.
- ^ Sports+, DH Les (30 July 2002). "Les premiers ratés de l'ascenseur des Marolles". DH Les Sports + (in French). Retrieved 19 June 2021.