Changchun Qiao station
![]() Line 12 platform | ||||||||||||||||
General information | ||||||||||||||||
Location | Changchun Bridge (长春桥) Landianchang North Road (蓝靛厂北路) / Landianchang South Road (蓝靛厂南路) and Yuanda Road (远大路) / Changchunqiao Road (长春桥路) Haidian District, Beijing China | |||||||||||||||
Coordinates | 39°57′31″N 116°17′39″E / 39.958527°N 116.294255°E | |||||||||||||||
Operated by | Beijing Mass Transit Railway Operation Corporation Limited | |||||||||||||||
Line(s) | Line 10 Line 12 | |||||||||||||||
Platforms | 4 (2 island platforms) | |||||||||||||||
Tracks | 4 | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Underground | |||||||||||||||
Accessible | Yes | |||||||||||||||
History | ||||||||||||||||
Opened | December 30, 2012 December 15, 2024 (Line 12) | (Line 10)|||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
|
Changchun Qiao station[1] (simplified Chinese: 长春桥站; traditional Chinese: 長春橋站; pinyin: Chángchūn Qiáo zhàn) is an interchange station between Line 10 and Line 12 of the Beijing Subway.[2] The Line 10 station opened on December 30, 2012.[3] The Line 12 station opened on December 15, 2024.
Station layout
[edit]The station has underground island platforms for both Line 10 and Line 12.
Location and name
[edit]
It is located a short distance from the Golden Resources Mall, one of the world's largest shopping malls. The station also serves the Yuanda residential area.

The station is named after Changchun Bridge (simplified Chinese: 长春桥; traditional Chinese: 長春橋; pinyin: Chángchūn Qiáo), a bridge on Jingmi Diversion Canal.
Exits
[edit]There are 6 exits, lettered A1, A2, B, C, D1, and D2. Exits A1, A2, C and D2 have accessible elevators.
Gallery
[edit]-
Platform (Line 10)
-
Concourse (Line 10, July 2013)
-
Concourse (Line 10, February 2021)
-
Platform (Line 10, November 2018)
-
Concourse (Line 12, December 2024)
-
Concourse (Line 12, December 2024)
-
Exit A1, Line 10
-
Exit A2, Line 10
-
Elevator at Exit A2, Line 10
-
Exit B, Line 12
-
Exit C, Line 12
-
Elevator at Exit C, Line 12
-
Exit D1, Line 10
-
Exit D2, Line 10
-
Elevator at Exit D2, Line 10
References
[edit]- ^ a b "JPG格式线路图下载 北京地铁官方网站". Archived from the original on 14 February 2025.
- ^ (Chinese) 地铁车站首次下穿立交桥. 新浪. Archived from the original on 29 January 2022. Retrieved 28 January 2022.
- ^ (Chinese) 轨道交通四条新线12月30日开通试运营. Beijing Municipal Transportation Administration Bureau. Archived from the original on 11 May 2013. Retrieved 29 December 2012.
External links
[edit]Media related to Changchunqiao Station at Wikimedia Commons