Jump to content

Hub Power Company

From Wikipedia, the free encyclopedia

The Hub Power Company Limited
Company typePublic
PSXHUBC
KSE 100 component
KSE 30 component
IndustryElectricity generation
Founded1991; 33 years ago (1991)
Headquarters,
Pakistan
Area served
Pakistan
Key people
  • Habibullah Khan "Chairman".
RevenueIncrease Rs. 130.525 billion (US$450 million) (2024)
Increase Rs. 70.018 billion (US$240 million) (2024)
Total assetsIncrease Rs. 452.804 billion (US$1.6 billion) (2024)
Total equityIncrease Rs. 190.368 billion (US$660 million) (2024)
OwnerMega Conglomerate
Number of employees
801 (2024)
SubsidiariesHub Power Services Limited
Narowal Energy Limited
Laraib Energy Limited (74.95%)
Thar Energy Limited (60%)
Prime International Oil & Gas Company Limited (50%)
China Power Hub Operating Company Limited (49%)
China Power Hub Generation Company Limited (47.5%)
ThalNova Power (38.3%)
Mega Motor Company (50%)
Websitehubpower.com
Footnotes / references
Financials as of 30 June 2024 [1]

The Hub Power Company Limited, (Urdu: حب پاور) colloquially known as Hubco, is a Pakistani power company based in Karachi, Sindh. It was the first independent power producer (IPP) established in Pakistan, and currently is the largest IPP in the country. [2]

Hubco is listed on the Pakistan Stock Exchange.[3][4]

History

[edit]

1991–1998: Initial years

[edit]

Hub Power Company (Hubco) was founded in 1991.[5] The project was funded by $770 million in loan agreements and $325 million in equity from international investors.[6] The major investors included National Power with 20.4 percent shareholding, Xenel with 14.5 percent, and Entergy with a 10 percent holding.[6][7]

Hubco also raised $175 million through the issuance of global depository receipts (GDRs) on the Luxembourg Stock Exchange, which peaked at $13.25 upon introduction to the market on 5 October, with each GDR consisting of 25 shares.[6][8] Local investors were allocated approximately 69 million shares valued at $30 million following an initial public offering on the Karachi Stock Exchange at PKR 13.60.[6][9]

Of the $770 million loan, Hubco secured a $686 million, 12-year credit facility organized by Citibank and other major banks on 30 September 1994, which included a $36.9 million concessional loan from the Commonwealth Development Corporation and $465 million from loans facilitated by the World Bank-funded public-sector energy development fund, including $166 million in standby funds at an interest rate of 2 percent plus Libor.[6][10] The company also obtained a local currency loan of Rs 3,012 million ($98.4 million) on 2 October in Karachi, arranged by the National Development Finance Corporation and involving several Pakistani banks.[6]

By 1998, Hubco became the second largest listed company on the Karachi Stock Exchange by market capitalization.[11] Initially, the revenue of the company was denominated in United States dollars.[12] In October 1998, the Nawaz Sharif administration canceled parts of energy purchase agreement with Hubco due to corruption and high energy tariff.[13]

1998–2018: Lawsuits, renegotiation of contracts, and decline

[edit]

In 2000, Hubco and its investors, including Entergy and National Power, agreed to forgive $200 million of the $274 million debt owed by the Water and Power Development Authority to Hubco. Hubco also reduced its tariffs and operation and maintenance contracts in 2002, reducing internal rate of return from 17 percent to 12 percent.[5][14] These adjustments were made to manage the remaining $74 million required for loan repayments.[14] Previously, Entergy had filed a lawsuit against WAPDA in the International Court of Arbitration which was withdrawn following a settlement.[15] The lawsuit sought approximately $8 billion in damages over the 30-year life of the independent power project.[15] The claim was filed in response to WAPDA's withdrawal from the power purchase agreement, which was based on allegations of corruption involving former Hubco's business executives.[15][5]

In 2008, Hubco acquired a 75 percent stake in Laraib Energy and initiated an 84MW run-of-river hydroelectric power project downstream on the Mangla Dam.[16] In 2013, Laraib Energy's New Bong Hydropower Plant commenced commercial operation.[17]

In 2011, Xenel exited Pakistan and sold its stake of 140 million shares (12.3 per cent) at a price of Rs37 per share.[18] A year later, National Power UK divested its 17.44 percent shareholding to Dawood Hercules and Allied Bank Limited at PKR 31 per share.[19]

In 2013, Hubco incorporated its oil-fired Narowal Power Plant as its wholly-owned subsidiary.[20]

In 2017, Hubco delisted its GDR from the Luxembourg Stock Exchange due to low trading volumes.[21]

In 2018, Mega Conglomerate took over the company.

2018–present: Diversification and termination of contract

[edit]

In 2019, the China Power Hub Generation Company (CPHGC) commissioned a 1.32GW coal-fired thermal power plant.[22] The $2 billion facility is now fully operational and is owned by CPHGC, a joint venture between Hubco and China Power International.[22] Hubco holds a 74 percent stake in the venture, while China Power International owns the remaining 26 percent.[22]

In 2022, Prime International, a joint venture of Hubco, acquired the Italian energy multinational Eni's E&P subsidiary Eni Pakistan.[23]

In October 2024, Hubco prematurely terminated its energy purchase agreement for the power station based in Hub with the government of Pakistan amid concerns about coercion and threats of corruption cases against IPP owners if they sought international arbitration.[24][25]

Group

[edit]

Subsidiaries

[edit]
  • Narowal Energy Limited (NEL): Wholly owned by HUBCO. It manages and operates the Narowal Power Plant[26][3]
  • Hub Power Services Limited (HPSL): Wholly owned subsidiary of HUBCO
  • Hub Power Holdings (HPHL): Incorporated to invest in future growth projects
  • Thar Energy Limited (TEL): HUBCO has 60% shareholding in TEL which is setting up a 330-megawatt (MW) Thar Lignite Coal-based mine mouth Power Plant and is a part of the China-Pakistan Economic Corridor (CPEC)
  • Laraib Energy Limited (LEL): HUBCO owns 74.95% of LEL which is the owner and developer of the New Bong Escape Power Project[3]

Associates

[edit]
  • China Power Hub Generation Company (CPHGC) is the project company for the development, construction and operation of 2×660 MW Coal-fired Power Plant in Hub, Balochistan near the Hub plant. HUBCO has 46% stake in CPHGC[3]
  • Sindh Engro Coal Mining Company Limited (SECMC) is an open-pit mining company in which HUBCO has 8% stake[3]
  • ThalNova Power Thar (Pvt.) Ltd. is a 330 MW mine-mouth lignite fired power plant in which HUBCO has acquired majority shares[27]

Operational plants

[edit]
  • Hub Plant (1,292 MW) is located 60 km from Karachi in Hub. The electricity at Hub is generated by four 323 megawatt oil-fired units that are supplied by a 78 km long pipeline from Pakistan State Oil. It consists of four generating units, each unit has capacity of 323 MW gross output, with an oil-fired single re-heat boiler and tandem compound and two cylinder condensing steam turbines directly coupled to a hydrogen cooled generator.[28]
  • Narowal Power Plant (225 MW) located in Narowal, Punjab consists of 11 generating sets, 11 Alborg Heat Recovery Steam Generators and one air cooled condensing Steam Turbine from Dresser Rand.[26]
  • New Bong Escape Power Project (84 MW), located in Mirpur, Azad Jammu& Kashmir, commenced commercial operations on 23 March 2013 and has the distinction of being Pakistan and AJ&K's first hydropower IPP. The Project uses the water discharged from an upstream already existing hydropower plant located at Mangla Dam.[29]
  • China Power Hub Generation Company (CPHGC) Power Plant(1320 MW) is an imported coal-based plant supplying energy to the national grid and located at Hub. The CPHGC plant consists of two generating units each rated at 660 MW Gross, with each unit having GE supercritical boilers, steam turbine and generator sets.[3][30]
  • Thar Energy Limited (TEL) Project is a lignite-based 330 MW project. The project achieved commercial operations on 10 October 2022.
  • ThalNova Power Thar is also a 330 MW mine-mouth lignite-fired power plant similar to TEL. Commercial operations of the project commenced in February 2023.

Other projects

[edit]
  • Sindh Engro Company Limited (SECMC) has developed a coal mine at Thar which has the seventh largest reserves of coal in the World. SECMC achieved Commercial Operations for Phase I in July, 2019 and will be embarking to double its coal mining capacity to supply fuel to HUBCO's Thar Energy Limited and ThalNova projects which are under construction.[31]
  • Prime International Oil & Gas Company a newly established joint venture (JV) between Eni Pakistan local employees and Hub Power Company acquired Eni's assets in Pakistan. These assets include interests in eight development and production leases and four exploration licences.
  • In 2024 HUBCO entered into a new line of business in electric vehicles with BYD Auto Industry Company Limited in Pakistan. The company will manufacture and sell BYD’s vehicles. .



See also

[edit]

References

[edit]
  1. ^ "Hub Power Annual Report 2024". Retrieved 8 October 2024.
  2. ^ "HUBCO company profile".
  3. ^ a b c d e f Hussain, Dilawar (24 September 2018). "Further growth for Hub Power Company". Dawn. Pakistan. Retrieved 20 June 2021.
  4. ^ Hussain, Dilawar (6 November 2001). "Hub Power Company: CORPORATE PROFILE". Dawn. Pakistan. Retrieved 20 June 2021.
  5. ^ a b c Tirmizi, Farooq (2 December 2019). "The spectacular decline of Hubco". Profit by Pakistan Today.
  6. ^ a b c d e f "MEED | PAKISTAN: Hubco financing reaches final stages".
  7. ^ "Power crazy" – via The Economist.
  8. ^ "Hub Power Company Limited". Brecorder. 5 May 2016.
  9. ^ "MEED | PAKISTAN: Hubco completes financing".
  10. ^ "MEED | PAKISTAN: Hub syndication oversubscribed".
  11. ^ "Pakistani Leader Catches Criticism On Economic, Political Leadership". WSJ.
  12. ^ Segal, Philip; Tribune, International Herald (16 August 1997). "Pakistan" – via New York Times.
  13. ^ Rao, N. Vasuki (14 October 1998). "PAKISTAN CANCELS HUBCO CONTRACT". Journal of Commerce.
  14. ^ a b Writer, NS Energy Staff (20 April 2000). "Hubco IPP settlement".
  15. ^ a b c Writer, NS Energy Staff (20 October 2000). "Entergy withdraws Hubco case".
  16. ^ Writer, NS Energy Staff (8 August 2008). "HubCo pursues Pakistan hydro IPP with Laraib stake".
  17. ^ Writer, NS Energy Staff (25 March 2013). "Hubco commences operations at 84MW New Bong Hydropower project in Pakistan".
  18. ^ Hussain, Dilawar (4 November 2013). "Hubco's footprint on energy sector". DAWN.COM.
  19. ^ Hussain, Dilawar (12 June 2012). "Hub Power Company is sold". DAWN.COM.
  20. ^ "Power generation: HUBCO to incorporate Narowal plant as a subsidiary". The Express Tribune. 28 February 2013.
  21. ^ "Hubco delists from Luxembourg Stock Exchange". The News International.
  22. ^ a b c Rani, Kondapuram Sampangi Archana (25 October 2019). "Pakistan commissions 1.32GW CPHGC coal-fired power plant".
  23. ^ "Prime International acquires Eni's business in Pakistan: Hubco". Brecorder. 30 December 2022.
  24. ^ Jamal, Nasir (30 September 2024). "A power sector malady". DAWN.COM.
  25. ^ Shehzad, Rizwan (10 October 2024). "Govt ends contracts with five IPPs". The Express Tribune.
  26. ^ a b "Hubco to set up 225 MW plant at Narowal". The Nation (newspaper). 24 June 2008. Retrieved 20 June 2021.
  27. ^ "Hubco Analyst Briefing Feb, 2020" (PDF).
  28. ^ "Power Generation & Distribution: THE HUB POWER COMPANY LIMITED – Year Ended June 30, 2005 (Audited)". Business Recorder (newspaper). 8 December 2005. Retrieved 20 June 2021.
  29. ^ "Laraib Energy Limited". 3 June 2023.
  30. ^ "HUBCO Annual Report 2019" (PDF).
  31. ^ "Hubco generation capacity doubles in six years: Chairman". Business Recorder (newspaper). 17 March 2018. Retrieved 20 June 2021.
[edit]