Nauka (ISS module): Difference between revisions
That's a file name. |
→7th launch attempt: see the page's citation no 65 currently where the second image shows that the pirs module hatch is closed |
||
Line 116: | Line 116: | ||
On 9 July 2021, ILS completed stacking of the Proton rocket at Site 200 and all three of the lower stages are fueled and standing by for the arrival of ''Nauka'' with the Briz-M cruise stage attached underneath. Because of delays with rewrapping the sensors rollout is scheduled for 17 July 2021 with launch on the 21st.<ref>{{Cite web|title=Новости. Завершена подготовка ракеты-носителя «Протон-М» к сборке ракеты космического назначения|url=https://www.roscosmos.ru/31828/|access-date=2021-07-10|website=www.roscosmos.ru}}</ref>Also on 9 July 2021, teams from ILS, Khrunichev, Roscosmos, Energia, and Yuzhny Space Center conducted a dry countdown to test the new computers and systems at Site 200 which will control ''Nauka'' and feed it and the Proton rocket telemetry through the first 12 minutes of flight up until first stage separation and fairing jettison where telemetry will be controlled from ground stations and from [[RKA Mission Control Center|Mission Control Moscow]].<ref>{{Cite web|title=News. Proton launch complex retrofit completed at Baikonur|url=http://en.roscosmos.ru/22216/|access-date=2021-07-11|website=en.roscosmos.ru|language=en}}</ref> On 10 July 2021 Nauka was fueled and the aft compartment was closed out in preparation for the transfer to Site 200 where it will be mated to the Briz-M upper stage before both are attached to the Proton.<ref>{{Cite web|title=Nauka module to ISS filled up with fuel, no remarks - Roscosmos chief|url=https://tass.com/science/1312673|access-date=2021-07-13|website=TASS}}</ref> Launch is scheduled for 21 July 2021 at 17:54 Moscow time 14:54 GMT.<ref>{{Cite web|last=July 2021|first=Leonard David 12|title=Russia's new Nauka module readied for launch to International Space Station|url=https://www.space.com/russia-nauka-space-station-module-readied-for-launch|access-date=2021-07-13|website=Space.com|language=en}}</ref> |
On 9 July 2021, ILS completed stacking of the Proton rocket at Site 200 and all three of the lower stages are fueled and standing by for the arrival of ''Nauka'' with the Briz-M cruise stage attached underneath. Because of delays with rewrapping the sensors rollout is scheduled for 17 July 2021 with launch on the 21st.<ref>{{Cite web|title=Новости. Завершена подготовка ракеты-носителя «Протон-М» к сборке ракеты космического назначения|url=https://www.roscosmos.ru/31828/|access-date=2021-07-10|website=www.roscosmos.ru}}</ref>Also on 9 July 2021, teams from ILS, Khrunichev, Roscosmos, Energia, and Yuzhny Space Center conducted a dry countdown to test the new computers and systems at Site 200 which will control ''Nauka'' and feed it and the Proton rocket telemetry through the first 12 minutes of flight up until first stage separation and fairing jettison where telemetry will be controlled from ground stations and from [[RKA Mission Control Center|Mission Control Moscow]].<ref>{{Cite web|title=News. Proton launch complex retrofit completed at Baikonur|url=http://en.roscosmos.ru/22216/|access-date=2021-07-11|website=en.roscosmos.ru|language=en}}</ref> On 10 July 2021 Nauka was fueled and the aft compartment was closed out in preparation for the transfer to Site 200 where it will be mated to the Briz-M upper stage before both are attached to the Proton.<ref>{{Cite web|title=Nauka module to ISS filled up with fuel, no remarks - Roscosmos chief|url=https://tass.com/science/1312673|access-date=2021-07-13|website=TASS}}</ref> Launch is scheduled for 21 July 2021 at 17:54 Moscow time 14:54 GMT.<ref>{{Cite web|last=July 2021|first=Leonard David 12|title=Russia's new Nauka module readied for launch to International Space Station|url=https://www.space.com/russia-nauka-space-station-module-readied-for-launch|access-date=2021-07-13|website=Space.com|language=en}}</ref> |
||
On 13 July 2021, the Russian astronauts, Oleg Novitsky and Pyotr Dubrov carried out work on the Pirs module, splitting up the hydraulic circuit and module control communications via the Progress spacecraft, as well as checked the docking unit and its systems.<ref>{{Cite tweet|number=1414914565024927748|user=OlegNovitsky|title=Pre-undocking preparations of pirs module and progress ms-16|date=13 July 2021}}</ref> <ref>{{Cite web|title=Новости. Модуль «Пирс» готовят к расстыковке|url=https://www.roscosmos.ru/31865/|access-date=2021-07-14|website=www.roscosmos.ru}}</ref> Also on 13 July 2021, Roscosmos revealed the mission patch for Nauka which is in the process of being painted on the fairing and on the Proton rocket itself. A smaller mission patch will be flown inside and is attached to the wall with Velcro.<!--The page is in Russian but some parts can be translated an English version will be released later on their website.--><ref>{{Cite web|title=News. Nauka module patch|url=http://en.roscosmos.ru/22220/|access-date=2021-07-14|website=en.roscosmos.ru|language=en}}</ref>On 14 July 2021, Roscosmos revealed the website for the module and has begun the countdown for launch. When Nauka docks a spacewalk will be preformed on 9 August 2021 by Novitsky and Dubrov to remove thermal shrouds for ERA and the hardware launched on Rassvet including Nauka's docking ball and the transfer compartment. This will free up ports for the Science Airlock and the Radiator and will allow ERA to retrieve its boom which is stowed on the Rassvet module. Before the Russian spacewalk a US spacewalk during the final week of July or the first week of August will send [[Shane Kimbrough]] and [[Thomas Pesquet]] outside to route cables to Zarya and to transfer a radiator grapple bar over to Rassvet. When Nauka arrives its first task after the Russian spacewalk is to grapple the airlock and the radiator and install them with Novitsky and Dubrov bolting them down and routing cables and piping in preparation for their deployment at the end of the spacewalk. <ref>{{Cite web|title=Multipurpose laboratory module "Science" |
On 13 July 2021, the Russian astronauts, Oleg Novitsky and Pyotr Dubrov carried out work on the Pirs module, splitting up the hydraulic circuit and module control communications via the Progress spacecraft, as well as checked the docking unit and its systems.<ref>{{Cite tweet|number=1414914565024927748|user=OlegNovitsky|title=Pre-undocking preparations of pirs module and progress ms-16|date=13 July 2021}}</ref> <ref>{{Cite web|title=Новости. Модуль «Пирс» готовят к расстыковке|url=https://www.roscosmos.ru/31865/|access-date=2021-07-14|website=www.roscosmos.ru}}</ref> Also on 13 July 2021, Roscosmos revealed the mission patch for Nauka which is in the process of being painted on the fairing and on the Proton rocket itself. A smaller mission patch will be flown inside and is attached to the wall with Velcro.<!--The page is in Russian but some parts can be translated an English version will be released later on their website.--><ref>{{Cite web|title=News. Nauka module patch|url=http://en.roscosmos.ru/22220/|access-date=2021-07-14|website=en.roscosmos.ru|language=en}}</ref>On 14 July 2021, Roscosmos revealed the website for the module and has begun the countdown for launch. When Nauka docks a spacewalk will be preformed on 9 August 2021 by Novitsky and Dubrov to remove thermal shrouds for ERA and the hardware launched on Rassvet including Nauka's docking ball and the transfer compartment. This will free up ports for the Science Airlock and the Radiator and will allow ERA to retrieve its boom which is stowed on the Rassvet module. Before the Russian spacewalk a US spacewalk during the final week of July or the first week of August will send [[Shane Kimbrough]] and [[Thomas Pesquet]] outside to route cables to Zarya and to transfer a radiator grapple bar over to Rassvet. When Nauka arrives its first task after the Russian spacewalk is to grapple the airlock and the radiator and install them with Novitsky and Dubrov bolting them down and routing cables and piping in preparation for their deployment at the end of the spacewalk. <ref>{{Cite web|title=Multipurpose laboratory module "Science" |
||
|url=https://www.roscosmos.ru/31395/|access-date=2021-07-14|website=en.roscosmos.ru|language=russian}}</ref> On the same Day, the [[Proton-M]] was attached with the Nauka module consisting of package of three stages at the technical complex of site No. 92 before the roll out day.<ref>{{Cite tweet|number=1415276353109250050|user=AnatolyZak|title=Proton-M attached to Nauka Module that is inside its payload fairing|date=13 July 2021}}</ref><ref>{{Cite tweet|number=1415279820783640582|user=AnatolyZak|title=Proton-M attached to Nauka Module that is inside its payload fairing, exact integration date|date=13 July 2021}}</ref><ref>{{Cite web|title=Новости. На Байконуре проходит сборка ракеты космического назначения «Протон-М»|url=https://www.roscosmos.ru/31858/|access-date=2021-07-14|website=www.roscosmos.ru}}</ref><ref>{{Cite web|title=Многоцелевой лабораторный модуль «Наука»|url=https://www.roscosmos.ru/31395/|url-status=live|access-date=2021-07-14|website=www.roscosmos.ru}}</ref><ref>{{Cite web|title= |
|url=https://www.roscosmos.ru/31395/|access-date=2021-07-14|website=en.roscosmos.ru|language=russian}}</ref> On the same Day, the [[Proton-M]] was attached with the Nauka module consisting of package of three stages at the technical complex of site No. 92 before the roll out day.<ref>{{Cite tweet|number=1415276353109250050|user=AnatolyZak|title=Proton-M attached to Nauka Module that is inside its payload fairing|date=13 July 2021}}</ref><ref>{{Cite tweet|number=1415279820783640582|user=AnatolyZak|title=Proton-M attached to Nauka Module that is inside its payload fairing, exact integration date|date=13 July 2021}}</ref><ref>{{Cite web|title=Новости. На Байконуре проходит сборка ракеты космического назначения «Протон-М»|url=https://www.roscosmos.ru/31858/|access-date=2021-07-14|website=www.roscosmos.ru}}</ref><ref>{{Cite web|title=Многоцелевой лабораторный модуль «Наука»|url=https://www.roscosmos.ru/31395/|url-status=live|access-date=2021-07-14|website=www.roscosmos.ru}}</ref><ref>{{Cite web|title= |
||
Nauka to feature three different docking ports (INSIDER CONTENT) |
Nauka to feature three different docking ports (INSIDER CONTENT) |
Revision as of 06:56, 15 July 2021
Module statistics | |
---|---|
COSPAR ID | 2021-066A |
Launch date | 21 July 2021 (planned) |
Launch vehicle | Proton-M |
Docked | 29 July 2021 (planned) |
Mass |
|
Length | 13 m (43 ft) |
Width | ~30 m (98 ft) |
Diameter | 4.25 m |
Pressurised volume |
|
Configuration | |
File:Rendering Nauka incuding components attached post Nauka Docking.jpg Rendering including components attached post-docking |
Nauka (Template:Lang-ru; lit. Science), also known as the Multipurpose Laboratory Module (MLM), (Russian: Многофункциональный лабораторный модуль, or МЛМ), is a component of the International Space Station (ISS) which has not yet been launched into space. The MLM is funded by the Roscosmos. In the original ISS plans, Nauka was to use the location of the Docking and Stowage Module. Later, the DSM was replaced by the Rassvet module and it was moved to Zarya's nadir port. Planners anticipate Nauka will dock at Zvezda's nadir port, replacing Pirs undocking on 23 July 2021, 12:45 UTC and deorbiting four hours later at 16:45 UTC.[1][2]
The launch of Nauka, initially planned for 2007, has been repeatedly delayed for various reasons. In May 2020, Nauka was reported to be planned for launch in the second quarter of 2021,[3] after which the warranties of some of Nauka's systems will expire. As of 7 July 2021, Nauka is planned for launch on 21 July 2021, 14:58 UTC, and will be docked on 29 July 2021, 13:25 UTC to Zvezda's nadir port.[4][5][6]
Original plans
In the 1990s, plans for the Russian Orbital Segment (ROS) of the ISS included several research modules that were intended to be adjacent to Zarya and Zvezda. In these earlier plans, the now-canceled complex of the Universal Docking Module (UDM) and the two newly developed Russian Research Modules were to be attached to Zvezda's nadir port – the UDM was to be based on the Functional Cargo Block FGB-2. The FGB-2 was originally built as a backup for the original launch of the Zarya (FGB) module – FGB-2's construction had been halted at 70% completeness in the late 1990s.[7]
However, the plans changed in the early 2000s. In August 2004, it was decided to build the Nauka ISS module based on the FGB-2.[8] During that time, there was an alternate rejected as a proposal for Nauka from RKK Energia, based on the canceled Commercial Enterprise Module (Entertainment and Studio Module), which was to be jointly funded by RKK Energia and SPACEHAB.[9]
Development and launch date
Development
At the end of 2005, the European Space Agency (ESA) agreed with the Russians that the European Robotic Arm would be launched together with Nauka, mated on its surface for a later deployment in space. A spare elbow joint for the European Robotic Arm was already launched together with Rassvet.[citation needed]
1st launch attempt
In 2004, the Roscosmos stated that Nauka should be ready for launch in 2007 on a Russian Proton rocket. However, the Nauka project was delayed further, first to 2008 and later to 2009. In November 2006, an ESA bulletin mentioned that the Roscosmos was negotiating with the ISS partners to push back the prospective launch date to the end of 2008. In October 2011, it was reported that Nauka was expected to be launched at the end of 2013.[10] In May 2012, it was reported that the launch date had been pushed back to 2014.[11] The next planned launch date was April 2014, according to Vitaly Lopota, president of RKK Energia.[12]
On 25 October 2013, Parabolic Arc reported that Nauka was flawed and had failed acceptance testing at RKK Energia.[13] Found problems in the propulsion system included a leaking fueling valve that needed to be replaced and contamination, which would require a lengthy cleaning.[14] The module was to be returned to Khrunichev for repairs which would take another 12 to 18 months.[13] On 27 November 2013, it was reported that Roscosmos had informed NASA that the launch had been postponed until at least 2015.[15]
2nd launch attempt
In April 2014, it emerged that the target date for launch was postponed to February 2017: a new propulsion system needed to be manufactured, as the installed system had exceeded its warranty.[14] The leaking fuel valve had also damaged the module's exterior plumbing, necessitating the replacement of most of the plumbing.[16]
3rd launch attempt
By November 2016, the tentative launch date had slipped to mid-2018.[17] aboard a Proton-M rocket. In December 2017, it then slipped further with a projected launch date of March 2019, before a 20 December 2018 launch date was confirmed.[18]
4th launch attempt
In August 2018, Roscosmos head Dmitry Rogozin set a new launch date of November 2019.[19] However, the propellant tanks were found to be contaminated with metallic dust in 2017, requiring repair and replacement work; a tentative new launch date in June 2020 was not met because the repair of the fuel tanks was initially unsuccessful; NPO Lavochkin was slated to produce new single-use fuel tanks based on the Fregat upper stage.[16] Production of this new fuel system, installation into Nauka (at NPO Energia), and additional testing would delay the launch to after 2020.[20]
On 17 October 2019, TASS released information about the successful repair of the original tanks, so Fregat-based tanks were not needed anymore. The launch date of Nauka in November 2019 was confirmed.[21]
5th launch attempt
On 14 November 2019, the Russians informed the European Space Agency (ESA) that the launch of Nauka would be postponed again for at least three months. A launch date in 2021 means further work on certifying aging equipment.
6th launch attempt
On 23 January 2020, TASS reported that the roll out was postponed until the end of March 2020 to replace valves on Nauka's fuel tanks.[22] On 4 February 2020, Dmitry Rogozin said Nauka required more testing because the warranty had expired and testing could only be done in Moscow instead of Kazakhstan delaying launch to January 2021. Testing is ongoing and should be completed by May 2020.[23] On 21 February 2020, the construction of the Proton rocket was completed and the stages were shipped to Baikonur.[24] On 2 April 2020, TASS reported that repairs to the valves were complete but the module's systems had yet to be tested before shipment to Baikonur, which would move the roll out to the end of May 2020. Due to concerns over the novel coronavirus, work has been suspended until 15 April 2020, but systems testing will be performed by a skeleton crew until work resumes.[25]
Despite the coronavirus, work never stopped despite the delay and a limited workforce. Nauka was shipped to Energia on time for vacuum testing which will take a month. Roll out was scheduled for the last week of June or the first week of July. Nauka faced another coronavirus delay in July and work resumed on 31 July 2020. Nauka was shipped out on 10 August 2020 and is expected to arrive at Baikonur in the coming weeks.[26][27] On 19 August 2020, the train carrying Nauka arrived at Baikonur and the module was unloaded from the rail car and taken to Site 254. Work involved installing the new tanks, installing the European Robotic Arm, installing the solar arrays, and placing Nauka into its payload fairing before the module is rolled over to the booster assembly facility and attached to the Proton rocket which will take it to space.[7][28]
On the morning of 21 August 2020, Nauka was delivered to the assembly and testing facility at Site 254 and removed from its shipping container. A crane then set it down on cradles and rolled the module into hard cell 5 where the contamination covers over the active hybrid docking mechanism were removed. On 11 September 2020, workers next installed a decontamination airlock and the hatch was opened so workers can take the shipping panels out to load the cargo and the launch restraints. Outside the micrometeoroid and orbital debris armor was installed over the new tanks and the batteries were installed. Over at the airport Antonov delivered the adapter ring which will be bolted to the aft end before the module is attached to the Proton. Fit checks with Prichal will be done before the module is placed in the fairing and delivered to Site 200 and attached to the Proton rocket.[29][30]
On 10 October 2020, Expedition 65 cosmonauts Oleg Novitsky and Pyotr Dubrov conducted the first part of the Crew Equipment Interface Test in preparation for their mission and Nauka's move to final assembly. The cosmonauts inspected systems and made their recommendations before they toured the outside of the module to locate the fittings they will attach their equipment to when the module arrives at the station next year.[31] Oleg Novitsky and Pyotr Dubrov returned to Baikonur on 2 November 2020 for the second part of the Crew Equipment Interface Test. Hatches were opened, antennas were deployed, and Nauka was powered on for the first time. On 3 November 2020, Nauka was put through a series of tests to make sure the systems that power it work when the module is in free flight before it docks to the ISS next year. To date, 306 tests have been completed of the 754 needed before Nauka can be transported to Site 200 for launch processing.[32][33]
On 15 January 2021, all docking hatches were installed, and the last of the MMOD armor and the radiators had been placed on the hull. In a nearby hangar, the solar arrays and the European Arm underwent final testing before they were to be installed at the end of June. On 16 January 2021, Roscosmos reported Nauka has reached 80% complete. During the month of January teams at Baikonur installed all the systems and tested the tanks and thrusters to flight level.[34][35]
On 24 February 2021, Oleg Novitsky and Pyotr Dubrov tested the software for the automated docking system. In the event Nauka fails to dock they can disable the auto pilot with the TORU and fly the module in manually.[36]
The launch date had been scheduled for May 2021, but because of issues with testing and new restrictions due to the coronavirus, which delayed processing and ISS crew schedules, Dmitry Rogozin scrubbed the launch until at least 15 July 2021, resulting in a new 2021/2022 launch schedule with better ballistic conditions.[5][6][37]
On 15 March 2021, Nauka was placed in the vacuum chamber to begin atmospheric testing. Rogozin said he will make his decision on launch when vacuum testing is completed the first week of April.[38] On 26 March 2021, the Expedition 65 prime and backup crew arrived in Baikonur for the final Crew Equipment Interface Test. While here they inspected Nauka and Soyuz MS-18 which are now in the final phase of processing before they are rolled out to the pad in April.[39][40]
On 21 April 2021 in an interview with reporters on Twitter Rogozin announced Nauka will be launched in July. Before the launch Oleg Novitsky and Pyotr Dubrov will do a spacewalk to detach Pirs and will do an inspection of the hull of the station.[41] Because of the risk of micrometeoroids Rogozin also said in the interview that Nauka will be detached from the station in 2025 and docked to NEM to form the new Russian space station called Russian Orbital Service Station (ROSS). As for the ISS it will be deorbited once the Axiom Orbital Segment is launched. Nauka has completed vacuum testing and the final components are being installed. Launch is scheduled for July if they remain on schedule. [42]
On 2 May 2021 the launch schedule was posted online which will involve the launch of Progress MS 17 on 30 June to deliver outfitting hardware to the station and plugs to fix the leak in the Zvezda Service Module. before it docks Novitsky and Dubrov performed a spacewalk to remove equipment and cables from Pirs in preparation for undocking.[43] Pirs will undock on 17 July after the launch of Nauka on the 15. Once Nauka is docked Progress MS 17 will do a fly around to test the Kirs system and redock to Nauka where it will stay until 24 November when it undocks taking a docking adapter away with it. Prichal will launch the day after and will dock to the station and the final spacewalk will be done before the service module that brought Prichal up is detached.[44]
On 9 May 2021, Nauka was returned to the vacuum chamber to perform leak checks and test the pneumatic systems. For this test the module will be filled with helium gas and pressurized to flight level. Once the test is complete the solar arrays will be installed and the European Arm will be attached to the hull before the radiators and the final layer of MMOD armor is installed. Encapsulation will take place at the end of June before the module is delivered to Site 200 where it will be attached to the rocket.[45]
On 11 May 2021, Nauka completed all vacuum test including the leak check and was returned to the hard stand in the slipway. Now the solar arrays and MMOD armor will be installed over the hull before the European Arm is attached. The solar arrays are on standby and will be installed once the tanks are filled with propellent and the thermal control system is topped off with ammonia. The covers that protected the hatches will also be removed and the docking adapter for Progress MS 17 will be installed. Work continues on the module with encapsulation scheduled for the end of June 2021.[46]
On 13 May 2021, Site 200 was modified with a special crane and systems to supply chilled air and fuel to the Proton launch vehicle and Nauka when they arrive at the pad. These same modifications were done at Site 81 when Mir, Zarya, and Zvezda were launched from this facility.[47]
On the morning of 20 May 2021, the European Arm was attached to the hull. Test will be done on the arm before the launch locks are secured and the protective cover is placed over the arm for launch.[48]
On 25 May 2021, Roscosmos conducted their flight readiness review signifying that all test are complete and the module is ready to be transported to Site 200 for final processing and mating to the launch vehicle. Launch is scheduled for 21 July 2021.[49][50]
On 4 June 2021, the solar arrays were added to the module and extended. Test will be conducted on the arrays before they are folded up before attachment of the stage adapter. The fairing is in the process of being assembled and will be attached to the spacecraft before both are loaded onto a flatcar for delivery to Site 200 at the end of June 2021 for final launch processing. That same day the cosmonauts of the next seven increments including Aleksandr Skvortsov and Sergey Prokopyev who have flown to the station in previous increments conducted a crew equipment interface test prior to encapsulation of Nauka and shipment to Site 200 for launch processing.[51]
On 7 June 2021, work at Site 200 was completed in preparation for the assembly of the launch vehicle and the rollout of Nauka to Pad 39 at the facility. To prevent the spread of contamination from the coronavirus and toxic fumes from the loading of the hypergolic fuel into the Briz-M tanks a temporary cleanroom will be constructed at the pad and a special cover will be made to cover the fairing until the launch vehicle is vertical on the pad.[52]
On 21 June 2021, the stage adapter was attached to Nauka and work has begun to unwrap the fairing and install it over the module. Over the coming days the fairing will be installed and Nauka will be loaded onto a transfer car for delivery to the airlock where it will be placed on a flatcar for delivery to Site 200 where it will be mated to the Proton. Rollout is scheduled for 17 July 2021 with launch taking place the week after on 21 July 2021.[53][54]
On 22 June 2021, technicians from Khrunichev, Roscosmos, Energia, and International Launch Services (ILS) have begun the process of fueling the Proton rocket at Site 92. Once fueling is complete the stages will be shipped to Site 200 where they will be mated to the Briz-M and to Nauka.[55]
On 28 June 2021, the final stage of prelaunch preparation of the Nauka Multipurpose Laboratory Module continues in the assembly and testing facility of Site 254 of the Baikonur Cosmodrome. Specialists of RSC Energia and the Khrunichev Center (both parts of Roscosmos) and other specialized enterprises of Roscosmos assembled and tested the Nauka module, its payload fairing and the transfer compartment as part of the ascent unit.[56] On the same day, Nauka was mated to the fairing and the aft bulkhead was installed. The module was then weighed and calibrated before it was lifted onto the transfer car and delivered to the airlock. Nauka was then placed on a flatcar and delivered to Site 31 where the module will be fueled and CO2 and compressed helium will be loaded into the ejector system to separate the fairing halves and jettison the stage adapter once Nauka reaches orbit.[57]
7th launch attempt
On 30 June 2021, fueling began but a problem with the spacecraft's guidance sensors was detected and Nauka was rolled back to the instrumentation and test facility at Site 254. The upper fairing was removed and rolled away while workers using safety harnesses changed and replaced the sensors and reinstalled the MLI. On 1 July 2021, more imperfections were found requiring a full scrub down and systems had to be removed and replaced.
On 3 July 2021, the fairing was reattached and the module was powered on to test the sensors before Nauka was reloaded onto the transfer car and redelivered to the airlock where it was placed on a flatcar for delivery to Site 31 for fueling and attachment to the Briz-M. Launch is now scheduled for 21 July 2021 and docking is scheduled for 29 July 2021. Two days after launch on the 23 July 2021, 13:25 UTC, Pirs will undock from the station and while the Starliner for Boeing OFT-2 will be docked to Harmony's forward port after Crew Dragon having SpaceX Crew-2 have relocated to Harmony Zenith port on 25 July, 2021. Nauka will then fly autonomously for four days behind the station while Pirs, Progress MS-16 on 23 July, 16:25 UTC, and sections of the Atlas V on 30 July 2021, which delivered Starliner are destroyed over the Pacific. Docking will occur at dawn on the 29 July, 13:26 UTC, and will require Nauka to do a 180 rotation to line up with Zvezda to attach itself to the station.[58][59][60]
On 9 July 2021, ILS completed stacking of the Proton rocket at Site 200 and all three of the lower stages are fueled and standing by for the arrival of Nauka with the Briz-M cruise stage attached underneath. Because of delays with rewrapping the sensors rollout is scheduled for 17 July 2021 with launch on the 21st.[61]Also on 9 July 2021, teams from ILS, Khrunichev, Roscosmos, Energia, and Yuzhny Space Center conducted a dry countdown to test the new computers and systems at Site 200 which will control Nauka and feed it and the Proton rocket telemetry through the first 12 minutes of flight up until first stage separation and fairing jettison where telemetry will be controlled from ground stations and from Mission Control Moscow.[62] On 10 July 2021 Nauka was fueled and the aft compartment was closed out in preparation for the transfer to Site 200 where it will be mated to the Briz-M upper stage before both are attached to the Proton.[63] Launch is scheduled for 21 July 2021 at 17:54 Moscow time 14:54 GMT.[64]
On 13 July 2021, the Russian astronauts, Oleg Novitsky and Pyotr Dubrov carried out work on the Pirs module, splitting up the hydraulic circuit and module control communications via the Progress spacecraft, as well as checked the docking unit and its systems. Thus in this process they closed the Pirs module hatch that is connected to the Zvezda Service module, ultimately being undocked on 23 July 2021.[65] [66] Also on 13 July 2021, Roscosmos revealed the mission patch for Nauka which is in the process of being painted on the fairing and on the Proton rocket itself. A smaller mission patch will be flown inside and is attached to the wall with Velcro.[67]On 14 July 2021, Roscosmos revealed the website for the module and has begun the countdown for launch. When Nauka docks a spacewalk will be preformed on 9 August 2021 by Novitsky and Dubrov to remove thermal shrouds for ERA and the hardware launched on Rassvet including Nauka's docking ball and the transfer compartment. This will free up ports for the Science Airlock and the Radiator and will allow ERA to retrieve its boom which is stowed on the Rassvet module. Before the Russian spacewalk a US spacewalk during the final week of July or the first week of August will send Shane Kimbrough and Thomas Pesquet outside to route cables to Zarya and to transfer a radiator grapple bar over to Rassvet. When Nauka arrives its first task after the Russian spacewalk is to grapple the airlock and the radiator and install them with Novitsky and Dubrov bolting them down and routing cables and piping in preparation for their deployment at the end of the spacewalk. [68] On the same Day, the Proton-M was attached with the Nauka module consisting of package of three stages at the technical complex of site No. 92 before the roll out day.[69][70][71][72][73]
Usage
Nauka is to be used initially for experiments, docking, and cargo. It will also serve as a crew work and rest area. Nauka will be equipped with full guidance and navigation control including engines and an attitude control system that can be used as a backup by the ISS. Especially it will bring some cargo with it that are containers with water, shelf module, elements for working with ERA, handrails, fans СОТР, elements from the KTsN, cables, etc. It will be docked onto the Zvezda module's nadir (Earth facing) docking port. Outfitting equipment launched in 2010 with the Rassvet (Mini-Research Module 1) on NASA's STS-132 will also be used for Nauka, the spare elbow joint for the European Robotic Arm (launched with Nauka), a heat exchanger, radiators, internal hardware and an experimental airlock will be positioned on modified passive forward port at the bottom of the module.[74][75] The new module will contain crew quarters with life support equipment including atmospheric processing, a galley, and a toilet.[10][76]
After launch, the Nauka module will dock with the nadir, or Earth-facing, port of the space station's Russian Zvezda service module. That location has been occupied by the Russian Pirs docking compartment since 2001. The Pirs module will be discarded before Nauka's arrival using a departing Russian Progress cargo freighter, which will guide itself back into Earth's atmosphere to burn up on re-entry with the Pirs compartment.[5][1]
Primary research module
Nauka will be Russia's primary ISS research module. For some time, NASA's official plans included a second research module around the same size as Nauka, listed to be "under review", but it was eventually cancelled, leaving Nauka to be the only Russian research module besides Rassvet and Poisk (Mini-Research Module 2).[1][7]
Temporary Docking Compartment
When Nauka module is installed (docked to Zvezda's nadir port) nauka will serve as a temporary docking compartment for ISS functioning similar to former Pirs docking compartment. It will have a passive docking port called Nauka nadir. Since it is temporary docking port, it will just be used for relocated dockings of Soyuz MS-18 and Progress MS-17. When Progress MS-17 undocks around 24 November 2021, it will remove the module's nadir port docking adapter and both will be deorbited together into the atmosphere of Earth for destruction over the South Pacific Ocean. After this, the final visiting spacecraft, Progress M-UM will be dock to it, having the Prichal module with it that will be docked permanently to it, thereby ending the docking operations of this ISS module. Lastly, a spacewalk will be done and the service module that brought Prichal up will be detached.
Specifications
- Length: 13 m (43 ft)
- Diameter: 4.11 m (13.5 ft)
- Mass: 20,300 kg (44,800 lb)
- Materials: stainless steel, aluminum alloy, kevlar and ceramic-wool insulation
See also
References
- ^ a b c Clark, Stephen (25 August 2020). "Russia's long-delayed space station research module arrives at launch base". Spaceflight Now. Retrieved 26 August 2020.
- ^ Morring, Frank (23 May 2012). "Russia Sees Moon Base As Logical Next Step". Aviation Week. Archived from the original on 12 November 2012. Retrieved 29 May 2012.
- ^ ""Роскосмос" сообщил дату запуска следующего российского модуля на МКС" [Roscosmos announces the launch date of the next Russian module on the ISS] (in Russian). RIA Novosti. 23 May 2020. Retrieved 3 June 2020.
- ^ "NASA Television Upcoming Events". NASA. 7 July 2021. Retrieved 7 July 2021.
- ^ a b c Zak, Anatoly (9 February 2021). "ISS set for the Russian expansion". RussianSpaceWeb.com. Retrieved 9 February 2021.
- ^ a b Klotz, Irene (26 October 2020). "ISS turns 20" (PDF). Aviation Week and Space Technology (AWST). pp. 48–54. Retrieved 30 October 2020.
- ^ a b c Atkinson, Ian (19 August 2020). "Russia's Nauka Arrives Baikonur for final launch preparations". NASASpaceFlight.com. Retrieved 20 August 2020.
- ^ "02.26.97.iss.memo". nasawatch.com. 1997. Retrieved 10 July 2008.[permanent dead link ]
- ^ Zak, Anatoly (20 November 1998). "Russian segment of the ISS". RussianSpaceWeb.com. Retrieved 3 October 2009.
- ^ a b Chernoivanova, Alina (19 October 2011). "Новые деньги под старую "Науку"" [New money for the old "Science"]. gazeta.ru (in Russian). Retrieved 1 February 2012.
- ^ Morring, Frank (23 May 2012). "Russia Sees Moon Base As Logical Next Step". Aviation Week. Retrieved 29 May 2012.
- ^ "О запусках новых российских модулей МКС" [About launches of new Russian modules to the ISS] (in Russian). 24 August 2013.
- ^ a b "Роскосмос сообщил НАСА, что модуль МЛМ не войдет в состав МКС в 2014 г." [Roscosmos has informed NASA that the MLM module will not join ISS in 2014] (in Russian). RIA Novosti. 27 November 2013.
- ^ a b Zak, Anatoly; Chabot, Alain (25 October 2013). "MLM Nauka (FGB-2) to expand the International Space Station". RussianSpaceWeb. Retrieved 7 April 2021.
- ^ "Russia Postpones Space Lab Launch Again". RIA Novosti. 27 November 2013. Archived from the original on 13 April 2014. Retrieved 9 April 2014.
- ^ a b Atkinson, Ian (3 July 2019). "Russia pressing forward on ISS expansion". NASASpaceFlight.com. Retrieved 5 July 2019.
- ^ Karasev, Sergey (7 November 2016). "Запуск лабораторного модуля "Наука" к МКС откладывается" [Launch of the Nauka laboratory module to the ISS postponed] (in Russian). Retrieved 13 January 2017.
- ^ Zak, Anatoly (22 March 2017). "This Russian ISS Module Has Been Delayed For a Decade and It's Still Not Ready to Fly". Popular Mechanics. Retrieved 20 August 2020.
- ^ "Research module Nauka to be launched to ISS in November 2019". TASS. 16 August 2018. Retrieved 20 August 2018.
- ^ "Источник: на модуль МКС "Наука" поставят баки от разгонного блока "Фрегат"" ["Source: tanks from the "Fregat" upper stage will be put on the ISS "Nauka" module"] (in Russian). TASS. 16 March 2019. Retrieved 17 March 2019.
- ^ "Источник: модуль "Наука" планируют отправить на Байконур 15 января 2020 года" [Source: "Science" module is planned to be sent to Baikonur on 15 January 2020]. tass.ru (in Russian). TASS. 17 October 2019. Retrieved 17 October 2019.
- ^ "Отправку модуля "Наука" на Байконур перенесли на март из-за работ с топливными баками" ["Sending the Science module to Baikonur was postponed to March due to work with fuel tanks"] (in Russian). TASS. 23 January 2020. Retrieved 29 January 2020.
{{cite web}}
: CS1 maint: url-status (link) - ^ "Launch of Nauka module in November hardly possible, says Roscosmos chief". TASS. Retrieved 3 April 2020.
- ^ "Russia's Proton-M rocket ready to deliver Nauka research lab to space station". TASS. Retrieved 3 April 2020.
- ^ "Russia postpones launch of Nauka research module to orbital outpost to 2021". TASS. Retrieved 3 April 2020.
- ^ "Nauka ISS module sent off to Baikonur". en.roscosmos.ru. Roscosmos. 10 August 2020. Retrieved 17 August 2020.
- ^ "Russia postpones dispatch of Nauka research module to Baikonur spaceport to August 10". TASS. Retrieved 17 August 2020.
- ^ "S.P. Korolev RSC Energia - News - Nauka module is being installed at the workstation". energia.ru. Retrieved 30 December 2020.
- ^ "Новости. На Байконуре продолжается подготовка модуля «Наука» к запуску" [Baikonur continues to prepare the "Science" module for launch]. roscosmos.ru. Retrieved 16 September 2020.
- ^ "S.P. Korolev RSC Energia - News - Nauka module pre-launch processing is in good progress at Baikonur". energia.ru. Retrieved 30 December 2020.
- ^ "Новости. Дублирующий экипаж МКС-64 провел занятие на модуле «Наука»" [ISS-64 backup crew conducted a lesson on the Nauka module]. roscosmos.ru. Retrieved 11 October 2020.
- ^ "Новости. Продолжаются испытания модуля «Наука»" [Testing of the "Science" module continues]. roscosmos.ru. Retrieved 9 November 2020.
- ^ "S.P. Korolev RSC Energia - News - Nauka module testing continues". energia.ru. Retrieved 30 December 2020.
- ^ "Новости. На космодроме Байконур продолжаются испытания модуля «Наука»" [Testing of the "Science" module continues at the Baikonur cosmodrome]. roscosmos.ru. Retrieved 24 January 2021.
- ^ "Nauka module testing continues at Baikonur Cosmodrome". en.roscosmos.ru. Retrieved 24 January 2021.
- ^ "ISS-65 crew passed the Nauka module exam manual teleoperator mode". en.roscosmos.ru. Retrieved 4 March 2021.
- ^ "Launch Of Russias Nauka Module To Space Station Likely To Be Postponed - Flight Schedule". UrduPoint. Retrieved 30 December 2020.
- ^ "Рогозин заявил, что дату запуска модуля "Наука" для МКС определят в апреле" [Rogozin announced that the launch date for the Nauka module for the ISS will be determined in April]. ТАСС. Retrieved 21 March 2021.
- ^ "Soyuz MS-18 spacecraft crews train in the Nauka module". en.roscosmos.ru. Retrieved 30 March 2021.
- ^ "РКК «Энергия» - Новости - Экипажи корабля «Союз МС-18» провели тренировки на модуле «Наука»" [News Crews of the Soyuz MS-18 spacecraft conducted training on the Nauka module]. energia.ru. Retrieved 30 March 2021.
- ^ "Cosmonauts Finish Spacewalk to Ready Station for New Module – Space Station". blogs.nasa.gov. Retrieved 5 June 2021.
- ^ "Nauka module to become integral part of the ISS — Roscosmos chief". TASS. Retrieved 27 April 2021.
- ^ "Cosmonauts Finish Spacewalk to Ready Station for New Module – Space Station". blogs.nasa.gov. Retrieved 5 June 2021.
- ^ "Источник рассказал подробности запуска нового российского модуля МКС" [The source told the details of the launch of the new Russian ISS module]. РИА Новости (in Russian). 2 May 2021. Retrieved 3 May 2021.
- ^ "Новости. Наземные испытания модуля «Наука»" [Ground tests of the "Science" module]. www.roscosmos.ru. Retrieved 11 May 2021.
- ^ "Новости. На Байконуре завершены пневмовакуумные испытания модуля «Наука»" [Pneumatic vacuum tests of the "Science" module completed at Baikonur]. www.roscosmos.ru. Retrieved 12 May 2021.
- ^ "Новости. На Байконуре дооснащают стартовый комплекс перед запуском модуля «Наука»" [Baikonur launch complex reequipped for the Nauka module launch]. roscosmos.ru. Retrieved 17 May 2021.
- ^ "Новости. Модуль «Наука» оснащен европейским манипулятором ERA" [The "Science" module is equipped with the European manipulator ERA]. roscosmos.ru. Retrieved 22 May 2021.
- ^ "Новости. Совет главных конструкторов в РКК «Энергия»" [Board of Chief Designers at RSC Energia]. roscosmos.ru. Retrieved 28 May 2021.
- ^ "ISS Nauka module passes trials, permission for launch granted — Roscosmos". TASS. Retrieved 1 June 2021.
- ^ "Новости. На Байконуре космонавтов ознакомили с устройством модуля «Наука»" [At Baikonur, cosmonauts were introduced to the structure of the "Science" module]. roscosmos.ru. Retrieved 7 June 2021.
- ^ "Новости. На Байконуре началась подготовка стартового комплекса РКН «Протон-М»" [At Baikonur, the preparation of the launch complex of the ILV "Proton-M" has begun]. roscosmos.ru. Retrieved 7 June 2021.
- ^ "Новости. Модуль «Наука» состыкован с промежуточным отсеком" [Module "Science" docked with the intermediate compartment]. roscosmos.ru. Retrieved 22 June 2021.
- ^ "РКК «Энергия» - Новости - Модуль «Наука» состыкован с промежуточным отсеком" [Module "Science" docked with the intermediate compartment]. energia.ru. Retrieved 22 June 2021.
- ^ "Proton-M launch vehicle preparation began at Baikonur". en.roscosmos.ru. Retrieved 23 June 2021.
- ^ "Nauka module ascent unit assembly". en.roscosmos.ru. Retrieved 28 June 2021.
- ^ "Новости. Сборка космической головной части модуля «Наука»" [Assembly of the space head of the module "Science"]. roscosmos.ru. Retrieved 29 June 2021.
- ^ "Модуль "Наука" для МКС вернули в монтажно-испытательный корпус для устранения замечания" [The "Science" module for the ISS was returned to the assembly and test building to eliminate the comment]. TASS. Retrieved 1 July 2021.
- ^ "Роскосмос отложил старт модуля МЛМ из-за недоделок". mk.ru (in Russian). Retrieved 2 July 2021.
- ^ "Новости. Запуск модуля «Наука» запланирован на 21 июля". www.roscosmos.ru. Retrieved 8 July 2021.
- ^ "Новости. Завершена подготовка ракеты-носителя «Протон-М» к сборке ракеты космического назначения". www.roscosmos.ru. Retrieved 10 July 2021.
- ^ "News. Proton launch complex retrofit completed at Baikonur". en.roscosmos.ru. Retrieved 11 July 2021.
- ^ "Nauka module to ISS filled up with fuel, no remarks - Roscosmos chief". TASS. Retrieved 13 July 2021.
- ^ July 2021, Leonard David 12. "Russia's new Nauka module readied for launch to International Space Station". Space.com. Retrieved 13 July 2021.
{{cite web}}
: CS1 maint: numeric names: authors list (link) - ^ @OlegNovitsky (13 July 2021). "Pre-undocking preparations of pirs module and progress ms-16" (Tweet) – via Twitter.
- ^ "Новости. Модуль «Пирс» готовят к расстыковке". www.roscosmos.ru. Retrieved 14 July 2021.
- ^ "News. Nauka module patch". en.roscosmos.ru. Retrieved 14 July 2021.
- ^ "Multipurpose laboratory module "Science"". en.roscosmos.ru (in Russian). Retrieved 14 July 2021.
- ^ @AnatolyZak (13 July 2021). "Proton-M attached to Nauka Module that is inside its payload fairing" (Tweet) – via Twitter.
- ^ @AnatolyZak (13 July 2021). "Proton-M attached to Nauka Module that is inside its payload fairing, exact integration date" (Tweet) – via Twitter.
- ^ "Новости. На Байконуре проходит сборка ракеты космического назначения «Протон-М»". www.roscosmos.ru. Retrieved 14 July 2021.
- ^ "Многоцелевой лабораторный модуль «Наука»". www.roscosmos.ru. Retrieved 14 July 2021.
{{cite web}}
: CS1 maint: url-status (link) - ^ "Nauka to feature three different docking ports (INSIDER CONTENT)". www.russianspaceweb.com. Retrieved 23 June 2021.
- ^ "Многоцелевой лабораторный модуль «Наука»". www.roscosmos.ru. Retrieved 14 July 2021.
{{cite web}}
: CS1 maint: url-status (link) - ^ "Nauka to feature three different docking ports (INSIDER CONTENT)". www.russianspaceweb.com. Retrieved 23 June 2021.
- ^ "Russia To Launch Two New Modules To ISS In 2021". Aviation Week. 5 November 2020. Retrieved 6 November 2020.
- ^ distingiush them from Canadarm2 and those strela cranes on decomissioned Pirs
External links
- – Description of MLM
- (in Russian) – Photos of the incomplete FGB-2 at Khrunichev.ru
- Новости российского сегмента МКС (in Russian) – November 2004 article discussing plans for MLM
- MLM (FGB-2) module of the ISS – RussianSpaceWeb.com on the history of the module
- MLM (Nauka) – from Gunter's Space Page