Jump to content

Istanbul Metro

From Wikipedia, the free encyclopedia

Istanbul Metro
Two trains waiting at Boğaziçi Üniversitesi on the M6 line
Two trains waiting at Boğaziçi Üniversitesi on the M6 line
Overview
Native nameIstanbul Metro İstanbul Metrosu
Owner
  • Istanbul Metropolitan Municipality
  • Ministry of Transport and Infrastructure (Selected stations on the M3 and M4 line and M11 line only)
LocaleIstanbul, Turkey
Transit typeRapid transit
Number of lines11 (4 more under construction)
Number of stations
  • 159;[1]
  • 36 under construction
  • 1 reserved
  • 20 on hold
Daily ridership1.36 million
Annual ridership612.912 million (2023) without L11[2]
WebsiteMetro Istanbul (in English)
Operation
Began operation3 September 1989; 35 years ago (1989-09-03)
Operator(s)
Number of vehicles727[1]
Technical
System length243.3 km (151.2 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification
System map

The 'M' logo, at the station entrance and passenger direction signs, should not be confused with the 'Metro Istanbul' logo for the company that operates the train system throughout Istanbul.[3]

The Istanbul Metro (Turkish: İstanbul metrosu) is a rapid transit railway network that serves the city of Istanbul, Turkey. Apart from the M11 line, which is operated by TCDD Taşımacılık, the system is operated by Metro Istanbul, a public enterprise controlled by the Istanbul Metropolitan Municipality. The oldest section of the metro is the M1 line, which opened on 3 September, 1989. As of 2024, the system now includes 159 stations in service,[1] with 36 more under construction. With 243.3 kilometers, Istanbul has the 21st longest metro line in the world and the 5th in Europe.[4]

The system consists of eleven lines: the lines designated M1A, M1B, M2, M3, M6, M7, M9 and M11 are on the European side of the Bosporus, while lines M4, M5 and M8 are on the Asian side. Due to Istanbul's unique geography and the depth of the Bosporus strait which divides the city, the European and Asian metro networks do not connect directly. The two parts of the city are linked through the Marmaray commuter rail line, which is connected to the metro in several places. Four metro lines are under construction on the Asian side: M10 (Pendik Merkez–Fevzi Çakmak), M12 (60. Yıl Parkı–Kazım Karabekir), M13 (Emek–Yenidoğan) and M14 (Altunizade–Bosna Bulvarı). Additionally, extension works on the M7 and M11 lines (on the European side) and the M4 and M5 lines (on the Asian side) are underway.

In addition to the Marmaray commuter rail, the metro connects to the F1, Tünel (F2), F3 and F4 funicular lines and with the network of the Istanbul Tram,[5] Metrobüs and the cable cars.

History

[edit]
Karaköy station of the Tünel, which entered service on 17 January 1875.

The oldest underground urban rail line in Istanbul is the Tünel, which entered service on 17 January 1875.[6] It is the world's second-oldest underground urban rail line after the London Underground which was built in 1863,[7] and the first underground urban rail line in continental Europe, however this is not recognised as the opening of the metro due to the line being Funicular.

The first master plan for a full metro network in Istanbul, titled Avant Projet d'un Métropolitain à Constantinople and conceived by the French engineer L. Guerby, dates to 10 January 1912.[8] The plan comprised a total of 24 stations between the Topkapı and Şişli districts and included a connection through the Golden Horn. Each station would have a 75-metre (246 ft 1 in) platform next to the rail line, while the distance between stations varied from 220 to 975 metres (721 ft 9 in to 3,198 ft 10 in). The blueprints of the project, which was never realized, are today displayed at the Istanbul Technical University Museum.

In 1936 the French urban planner Henri Prost proposed a metro network between the districts of Taksim and Beyazıt, to the north and south of the Golden Horn, respectively.[9][10] In October 1951 the Dutch firm Nedeco proposed a similar route between Taksim and Beyazıt, and in September 1952 the Director of the Paris Transportation Department, Marc Langevin, prepared a 14-chapter report together with his associate Louis Meizzonet for the implementation of the project and its integration with the other means of public transportation in the city. However, these plans never came into effect and all proposals were put on hold until 1987, when the planning for the current Istanbul Metro was made.

Logos used in the Istanbul metro
The logo designed by Faruk Çağla, who simultaneously won first, second and third prizes in the Istanbul metro emblem competition.
U logo used on subways built and operated by the Ministry of Transport and Infrastructure.

Construction works for the first 'modern' mass transit railway system started in 1989, with the first stations opening in September. İstanbul Ulaşım A.Ş. (now known as Metro Istanbul) was founded the previous year to operate the system. The M1 was initially called "Hafif Metro" (which literally translates as "light metro"). Although it was built as a fully grade separated line, the M1 line operates with shorter trainsets and shorter station platforms than is standard on a traditional metro line, hence its "light metro" designation. The M1 line was later extended from Aksaray towards the western suburbs, reaching Atatürk Airport in the southwest in 2002.[11]

Construction of the M2 line began on 11 September 1992, but faced many challenges due to the numerous archaeological sites that were discovered during the drilling process, which slowed down or fully stopped the construction of many stations, especially in the south. Taking into account the seismic activity in Istanbul, the entire network was built with the cut-and-cover method[citation needed] to withstand an earthquake of up to 9.0 on the Richter magnitude scale.[12][13]

The Golden Horn Metro Bridge entered service in 2014.

The first section between Taksim and 4. Levent entered service, after some delays, on 16 September 2000. This line is 8.5 km (5.28 mi) long and has 6 stations, which all look similar but are in different colours. In 2000, there were 8 Alstom-built 4-car train sets in service, which ran every 5 minutes on average and transported 130,000 passengers daily. On 30 January 2009, the first train sets built by Eurotem entered service.[14] Eurotem will build a total of 92 new trainsets for the M2 line.[14][15] As of 30 January 2009, a total of 34 trainsets, each with 4 cars, were being used on the M2 line.[15] A northern extension from 4. Levent to Maslak was opened on 30 January 2009.[16] On 2 September 2010, the northern (temporary) terminus of Darüşşafaka followed up.[17] The southern extension of the M2 line from Taksim to Yenikapı, across the Golden Horn with Haliç station on the bridge and underground through the historic peninsula, entered service on 15 February 2014. The Taksim-Yenikapı extension is 5.2 km (3.23 mi) long, with four stations. The total cost of the extension was $593 million.[18] At Yenikapı, it will intersect with the extended M1 line and the Marmaray commuter line, which since its opening in 2013 has offered a connection between the Asian and European sides of the city.

M11 Istanbul Airport Station

The trip between the Şişhane station in Beyoğlu and the Haciosman station in Maslak is 20 km (12.43 mi) long and takes 27 minutes; including Şişhane - Taksim (1.65 km (1.03 mi), 2 minutes), Taksim - 4. Levent (8.5 km (5.28 mi), 12 minutes), and 4. Levent - Haciosman (8.1 km (5.03 mi), 12 minutes.)[19][20] The total length of the European side of the M2 line will reach 23 km (14.29 mi) when all 16 stations from Hacıosman to Yenikapı will be completed;[21][22][23] not including the 93-metre (305 ft 1 in)-long Golden Horn Metro Bridge,[24] the 0.6 km (0.37 mi) long Taksim-Kabataş tunnel connection with the Seabus port,[25] and the 0.6 km (0.37 mi) long Yenikapı-Aksaray tunnel connecting the M1 line to the Yenikapı Transfer Center.[23]

On the Asian side, construction is in progress of the remaining portion of the 26.5 km (16.47 mi) long M4 line from Kadıköy to Kaynarca, yielding a total of 19 stations. It cost €751 million and was built by the Astaldi / Makyol / Gülermak consortium.[26] The first section opened on 17 August 2012, terminating in Kartal. Construction of the 20 km (12.43 mi) long M5 line from Üsküdar via Ümraniye to Çekmeköy started in March 2012.[27]

Operations

[edit]
Üsküdar metro station on the M5 line

The Metro operates from 06:00 AM to 00.00 AM every 6–12 minutes, except for the M8 line, which temporarily operates from 06:00 AM to 23:00 PM.[28] During peak hours the intervals could be reduced to 3 to 4 minutes.

The metro has a flat fare of 17.70 TL, a student rate of 8.64 TL, and a fare of 12.67 TL for teachers and senior residents,[29] when used with the Istanbulkart, the city's universal contactless payment card.[30]

Night operations

[edit]
Sabiha Gökçen Station on the M4 line

On 30 August 2019 as a gesture for the Victory Day of Turkey, Mayor of Istanbul, Ekrem İmamoğlu, announced that many lines of Istanbul were going to provide 24 hours service during the weekends with trains at 20 minutes interval.[31][32][33] Since August 2019, the Istanbul Metro started to provide 24 hours service for some lines on weekends and public holidays,[34] but this service was discontinued in March 2020 due to coronavirus pandemic. On March 5, 2022 Metro Istanbul announced that the night metro service would be re-started on the following lines: M1A Yenikapı-Atatürk Airport, M1B Yenikapı-Kirazli, M2 Yenikapı-Hacıosman, M4 Kadıköy-Sabiha Gökçen Airport, M5 Üsküdar-Çekmeköy, and M6 Levent-Boğaziçi University/Hisarüstü,[35] and later added M7 Mecidiyeköy-Mahmutbey on July 14, 2022.[36]

Lines

[edit]

Each line is given a different color and name. The letter "M" stands for metro, while "T" stands for tram, "F" stands for funicular, "TF" stands for cable car and "B" for suburban. Frutiger LT Pro is used as the font for the icons.

Line Route Side Opened(first) Length Stations Notes[37]
Yenikapı ↔ Atatürk Airport / Kirazlı European 1989[38] 26.8 km[39] 23[38]
  • Branches diverge at Otogar. Branch M1A runs to Atatürk Airport. Branch M1B runs to Kirazlı, with an extension to Halkalı currently on hold.
  • The line operates from 06:00 AM to 00.00 AM.
  • Trains are currently four cars in length, 5 car trains will run in the future
Yenikapı ↔ Hacıosman European 2000[40] 23.49 km[39] 16[40]
  • There is a branch line between Sanayi Mahallesi and Seyrantepe.
  • Operates from 06:00 AM to 00:00 AM.
  • Maximum 8 car trains, 4 car trains during off peak
Bakırköy-Sahil ↔ Kayaşehir Merkez European 2013[41] 26.7 km[39] 19[41]
  • Operates from 06:00 AM to 00.00 AM.
  • Yıldıztepe station is under construction.
  • Physical maximum 8 car trains (only 4 car trains used at this point due to ridership)
Kadıköy ↔ Sabiha Gökçen Airport Asian 2012[42] 33.5 km[42] 23[42]
  • An extension to Tuzla with 6 more stations is under construction.
  • Operates from 06:00 AM to 00.00 AM.
  • Maximum 8 car trains, 4 car trains used during off peak
Üsküdar ↔ Samandıra Merkez Asian 2017[43] 26.5 km[43] 20[43]
  • An extension 4.4 km from Samandıra Merkez to Sultanbeyli is under construction.
  • Sancaktepe Şehir Hastanesi station is under construction.
  • Operates from 06:00 AM to 00.00 AM.
  • Maximum 6 car trains, fully automated
Levent ↔ Boğaziçi Üniversitesi/Hisarüstü European 2015[44] 3.3 km[44] 4[44]
  • Called the "Mini-Metro", M6 is actually a light metro line.
  • Single track between stations, maximum 4 car trains
Yıldız ↔ Mahmutbey European 2020[45] 20 km[45] 17[45]
  • Opened partially on 28 October 2020. Fulya and Yıldız stations were put into service on January 2, 2023. Yıldız-Kabataş section is still under construction.
  • Physical maximum 8 car trains, but only 4 car trains used at the moment, fully automated
Bostancı ↔ Parseller Asian 2023[46] 14.27 km[46] 13[46]
  • Opened on 6 January 2023.
  • Medium capacity system, maximum 4 car trains, fully automated
  • Operates from 06:00 AM to 11.00 PM.
Olimpiyat ↔ Ataköy European 2021[47] 17.2 km[47] 14[47]
  • Opened partially on 29 May 2021 between Olimpiyat and Bahariye stations. On 18 March 2024, the line was fully put into service between Olimpiyat and Ataköy stations.
  • Physical maximum 4 car trains
Gayrettepe ↔ Arnavutköy Hastane European 2023[48] 51.5 km[48] 10[48]
  • Extension from Arnavutköy Hastane to Halkalı is under construction.
  • Higher maximum speed (120 km) than other lines, uses metro trains akin to Chinese metro type B trains in 4 car configuration
TOTAL: 243.26 km[39] 159[1]

Stations

[edit]
M2 (Istanbul Metro) (left) and Golden Horn Metro Bridge Station (right)

The Istanbul Metro system has a total of 158 stations in operation with 36 more under construction. Since the majority of the system is underground, stations are generally accessed going down from street level. At every station entrance there is a post with the Istanbul metro "M" logo and the station name underneath it except for the M11 line which has the "U" logo next to its own entrances.[49][50] Entrances are usually built into sidewalks along a street, although many stations of newer lines have their entrances from street level on small plazas.

Like Moscow Metro, the majority of the stations of the Istanbul Metro are generally deep level due to the city's hilly geography.

Out of the 158 operating stations of the Istanbul Metro:

  • 142 are fully underground
  • 7 are elevated stations
  • 7 are on an embankment or at-grade
  • 2 are partially underground

Mezzanines

[edit]
The mezzanine concourse at Yenikapı station (M1 and M2)

Most stations have a mezzanine directly below street level, which allows passengers to enter the stations from multiple locations and proceed to the correct platform without having to cross any streets. Inside the mezzanines are ticket machines and turnstiles, where passengers must pay to enter fare control zones and proceed to the trains.[51][52]

In some stations, mezzanines connect directly to nearby buildings and structures, such as shopping malls or business centres. Each station concourse or mezzanine are patrolled by Istanbul Metro security guards to prevent fare evasion and crime.

Stations with large walkways toward different exits, such as Taksim, also have travelators to cover the long walking distances.

Upon entering the station, passengers may use ticket vending machines or staffed ticket booths to purchase their fare, which can be stored on the Istanbulkart contactless smart card. After entering the fare-controlled area, via the turnstiles, passengers may continue further down to the platform level.

Platforms

[edit]
Yenikapı (left) on the M1 and M2 lines and Bostancı (right) on the M4 line are among the stations which have two island platforms and three tracks

Since the different lines of the Istanbul Metro have different specifications, most notably car length, there is no uniform length for platforms. The oldest platforms of the network, built between 1989 and 2002 on the M1 line, are 100 m (328 ft 1 in) and can accommodate trains up to 4 cars long. Platforms on the M2, M3, M4, M7 and M11 lines span about 180 m (590 ft 7 in) and can each accommodate trains up to 8 cars long. Platforms on the M5 line can accommodate up to 6-car trains, whiles platforms on the M6, M8, and M9 lines are accommodate 4-car trains.

Sections of platforms are subject to close during off-peak hours, especially on the M2 line. While platforms on the M2 line are open fully during peak hours, capacity is reduced to 4-car trains during off-peak hours. Platforms on the M5, M7, M8 and M11 lines are protected by platform edge doors. Except on funicular lines, most platforms of the Istanbul Metro consist of two side platforms or one island platform. Five stations consist of two island platforms, serving three tracks in a configuration known as the Spanish Solution. These stations are Otogar on the M1 line, Yenikapı and Sanayi on the M2 line, Olimpiyat on the M9 line, and Bostancı on the M4 line.

Design

[edit]

The stations on the M1 line, which were built in the 1980s and 1990s, are very functional and plain in design. Like many stations built during this period, the stations use fluorescent tubes as light sources, and are decorated with tiled floors and ceiling panels made of white plastic ceiling slats. Platforms of stations on the M1 line are supported by square and tiled central columns (e.g. Aksaray, Emniyet - Fatih and Topkapı - Ulubatlı.)

Stations on the M2 line built between 2000 and 2011, care was taken to use light colors. For this reason, the basic wall color of the stations is white. In order to make people not confuse the stations and to make them more memorable, some characteristic patterns were also implemented. (e.g. colored stripes/tiles on walls).

Stations on the M7 line, which were built between 2017 and 2020, mostly use a combination of gray and white colors. Since the line has fully automated driverless vehicles, passengers are prevented from falling onto the tracks by using platform screen doors (PSDs).

Technical specifications

[edit]

This table lists technical characteristics of the metro lines that are currently in service or under construction.

Line Route Gauge Voltage Conductor system Notes
Yenikapı ↔ Atatürk Airport 1,435 mm
(4 ft 8+12 in)
standard gauge
750 V DC Overhead line Light Metro
Yenikapı ↔ Kirazlı
Yenikapı ↔ Hacıosman Third rail
Bakırköy-Sahil ↔ Kayaşehir Merkez 1,500 V DC Overhead line
Kadıköy ↔ Sabiha Gökçen Airport
Üsküdar ↔ Samandıra Merkez 750 V DC The first driverless metro in Turkey
Levent ↔ Boğaziçi Üniversitesi Hisarüstü Third rail Mini light Metro
Yıldız ↔ Mahmutbey 1,500 V DC Overhead line The first driverless metro in Istanbul European Side
Bostancı ↔ Parseller Driverless metro
Olimpiyat ↔ Ataköy
Pendik YHT ↔ Sabiha Gökçen Airport Under Construction
Gayrettepe ↔ Halkalı Operated by TCDD
60. Yıl Parkı ↔ Kazım Karabekir Under Construction
Söğütlüçeşme ↔ Yenidoğan Partially Under Construction
Altunizade ↔ Küçüksu Partially Under Construction
Sefaköy – TÜYAP Planned
Beylikdüzü ↔ Sabiha Gökçen Havalimanı Hızray Project (Planned)

Alignment and interchanges

[edit]
M3 Mahmutbey Metro Station
M4 Ayrılıkçeşmesi Metro Station

Apart from the Haliç station on the M2 line, about half of the M1 (mostly M1A) line, Alibeyköy and Kağıthane valleys crossing by the M7 line, viaduct section at Menekşe River of the M3 line and viaduct section at Olimpiyat of the M9 line, the lines are fully underground. All station names are on the bus lines as well.

The M2 line has an interchange between F1 in Taksim and an interchange tunnel with the Zincirlikuyu Metrobus station at the Gayrettepe station.[53] There is also a transfer station at Yenikapı with Marmaray, M1 line and İDO Ferry Port; from where it is possible to take the high-speed catamaran Seabus departing for Bursa, Bandırma or Yalova; as well as the other Seabus ports of Istanbul such as Bostancı, Kadıköy, Bakırköy and Kabataş.

The M3 line has an interchange with the M9 line at the İkitelli Sanayi station, M7 line at the Mahmutbey station, M1 line at the Kirazlı station, M2, M1 and Metrobus at the İncirli station, and lastly Marmaray (B1) and YHT at Özgürlük Meydanı Station.

The M4 line has a vapur (traditional ferry), motorboat, İDO and nostalgic tram interchange at Kadıköy which is the heart of Istanbul's Asian side. One can also interchange to Marmaray at the Ayrılık Ceşmesi station. Also at Ünalan / Uzunçayır, the line has a Metrobus interchange just like Gayrettepe in M2.

The M5 line has an interchange with the Marmaray and İDO at the Üsküdar station. Also at Altunizade the line has a Metrobus interchange.

The M6 line has an interchange with the M2 line at the Levent station.

The M7 line interchanges with the M2 line at the Mecidiyeköy station, with the T4 tramway line at the Kiptaş-Venezia/Karadeniz station, and with the M3 at the Mahmutbey station.

The M8 line has an interchange with the Marmaray at the Bostancı station, with the M4 line at the Kozyatağı station and with the M5 line at the Dudullu station.

The M9 has an interchange with the M3 at Ikitelli station.

The M11 line interchanges with the M2 line and Metrobus at Gayrettepe station, and with the M7 line at Kağıthane station.

Rolling stock

[edit]

Aside from running on standard gauge tracks and all models having 4 doors per side, the rolling stock is generally incompatible, with few track connections to other lines and rolling stock generally will never run on any line other than whatever they first were delivered to. As each line is generally self-contained, this has rarely become an issue.

History

[edit]
Interior of M7 rolling stock

The first Istanbul full metro rolling stocks, which entered service on 16 September 2000, on the Taksim - 4. Levent line, were built by Alstom. These trains are air-conditioned and equipped with LCD screens, and share a similar exterior design to the first three generations of rolling stock used on the Caracas Metro in Venezuela.

On 30 January 2009, the first 8 trains (each with 4 wagons) built by Eurotem (the Turkish factory of Hyundai Rotem) entered service.[54] Today the system has 268 trains.[1] These trains are also air conditioned and equipped with LCD screens, as well as dynamic route map showing the location and direction of the train.[55]

In September 2009, CAF signed a contract to supply 144 units for the M4 metro line, amounting to 1.1 million euros. These metro units are formed with 4 cars for a total length of 90 meters and have a maximum transport capacity of 1300 passengers.[56]

In August 2013, tender for the 126 driverless train units for the M5 line was won by CAF and Mitsubishi with 119 million euros.[57] The first units were delivered in November 2016.[58]

In March 2016, Eurotem signed a contract to supply 300 driverless units for the M7 line, amounting to 280.200.000 euros.[59]

Rolling stocks by line

[edit]

M1A and M1B

[edit]

Although line M1 is a (light) metro line, its rolling stock—in use since 1989—is made up of typical ABB light rail vehicles (LRVs). These are partly the same as those used on the T4 tramway line. The rolling stock of the line is planned to be refurbished and made driverless.[60][61]

M2 and M6

[edit]

The rolling stock on the M2 and M6 lines, which totals a number of 192 units,[61] is made up of Alstom vehicles from France and Hyundai Rotem vehicles from South Korea which are manufactured in Adapazarı by Eurotem. All wagons have 8 double doors, making them have 4 openings on each side per wagon, the rolling stock also includes a fast passenger change, heating, air conditioning and broadcasting system. These lines are the only lines to use third rail power.

M3 and M9

[edit]

The rolling stock on the M3 line, consists of 68 Alstom Metropolis AM4 (similar-looking vehicles are used at M4 Budapest Metro) units. Some of them are also used on the M9 Ataköy-Olimpiyat metro line.

M4

[edit]

Line M4 uses CAF rolling stock. Trains operate in 4-car sets and can couple to form 8-car trains.

M5

[edit]

Line M5 uses driverless 6-car CAF rolling stock.

M7 and M8

[edit]

Line M7 uses driverless Hyundai Rotem rolling stock.[59] Trains are made of 4-car units and can couple to form 8-car trains, although these are not currently used. Line M8 uses very similar trains, but only as 4-car sets.

M11

[edit]

Line M11 uses CRRC rolling stock.

Future extensions

[edit]

As part of the Istanbul Metropolitan Municipality goal of expanding the size of the city rail transportation network to 630 km (390 mi) by 2030,[62] the Istanbul Metro has several lines that are under construction or planned. Since the city does not have a widespread railway network, the Metropolitan Municipality aims to connect urban areas of the city that do not have access to the Istanbul two coastal railways with metro lines.

Due to the city's unique geography and depth of the Bosporus which divides the city, none of the current Istanbul Metro lines cross the strait; lines are wholly located either on the European side or the Asian side of the city. In 2019, The Ministry of Transport and Infrastructure began the planning of a 30.2 km (18.8 mi) line that would link İncirli with Söğütlüçeşme via a tunnel under the Bosphorus also designed to accommodate road traffic.[63]

The following metro lines are under construction:

Line Route Length Stations Notes[64]
Kirazlı ↔ Halkalı 9.70 km (under construction) 9 (0 under construction) Opening in December 2028
Tavşantepe ↔ Tuzla 7.90 km (under construction) 6 (1 under construction) Tavşantepe–Kaynarca Merkez: opening in 2025
Samandıra Merkez ↔ Sultanbeyli 4.4 km (under construction) 3 (under construction) Opening in late 2025
Kabataş ↔ Yıldız 4.5 km (under construction) 2 (under construction) Opening in June 2025[65]
Mahmutbey ↔ Esenyurt Meydan 18.1 km (under construction) 11 (5 under construction) Mahmutbey–Hastane: opening in late 2026
Hastane–Esenyurt Meydan: opening in late 2028
Pendik Merkez ↔ Fevzi Çakmak 4.90 km (under construction) 2 (under construction) Opening in Q4 2025
Halkalı ↔ Arnavutköy Hastane 31.5 km (under construction) 5 (under construction) Opening in late 2025
60. Yıl Parkı ↔ Kazım Karabekir 13.0 km (under construction) 11 (under construction) Opening in second half of 2025
Emek ↔ Yenidoğan 6.9 km (under construction) 5 (under construction) Opening in October 2028
Altunizade ↔ Bosna Bulvarı 4.5 km (under construction) 4 (under construction) Opening in 2025
TOTAL: 105.4 km 58 (38 under construction)

Construction of the following metro lines are planned or on hold:

Line Route Length Stations Notes[66]
Yenikapı ↔ Sefaköy 14 km (planned) 10 (planned) Line planned
Söğütlüçeşme ↔ Emek 17.7 km (planned) 10 (planned) Line planned
Sefaköy ↔ TÜYAP 18.5 km (planned) 10 (planned) Line planned
Beylikdüzü ↔ Sabiha Gökçen Airport 74.5 km (planned) 13 (planned) Line planned

European side

[edit]
Istanbul network with lines and extensions under construction

M7 metro line extension

[edit]

The M7 Kabataş-Yıldız metro line extension is under construction. The extension will have 2 new stations and is expected to go into service in 2025.[67] It will interconnect with ferries at Beşiktaş and Kabataş stations, with T1 trams line at Kabataş station and with F1 funicular line at Kabataş station.

M11 Metro Line

[edit]
M11 Göktürk Metro Station

The M11 Gayrettepe-Arnavutköy Hastane metro extension to Halkalı is under construction. The extension from Arnavutköy Hastane to Halkalı will be opened in late 2025.

Asian side

[edit]
Göztepe Metro Station
Fevzi Çakmak Hastane Metro Station
M4 metro line

M4 Kadıköy–İçmeler Metro Line is extending to İçmeler. Planned opening date of Kaynarca Merkez is 2025. Construction between Kaynarca Merkez and İçmeler has not started yet.

  1. Kaynarca Merkez (M10 Line Interchange)
  2. Çamçeşme
  3. Kavakpınar
  4. Esenyalı
  5. Aydıntepe
  6. İçmeler (Marmaray Interchange)
M5 metro line

M5 Üsküdar–Çekmeköy-Sultanbeyli Metro Line was being extended a tender signed in April 2017 but construction was restarted in November 2019. The section between Çekmeköy and Samandıra Merkez opened on 16 March 2024 and the remaining section to Sultanbeyli is expected to open in 2025.

  1. Veysel Karani
  2. Hasanpaşa
  3. Sultanbeyli
M12 metro line
Yenisahra Station

The M12 60. Yıl Parkı-Kazım Karabekir Metro Line will connect the underserved Ataşehir district with the regional centres of densely populated Ümraniye and integrate those districts into the Istanbul rapid rail system. Planned opening date is 2025.

  1. 60. Yıl Parkı
  2. Tütüncü Mehmet Efendi (Marmaray Interchange)
  3. Sahrayıcedit
  4. Yenisahra (M4 Line Interchange)
  5. Ataşehir
  6. Finans Merkezi
  7. Site
  8. Atakent
  9. Çarşı (M5 Line Interchange)
  10. SBÜ Hastanesi
  11. Kazım Karabekir
M14 metro line
Altunizade Metro Station

The M14 Altunizade-Bosna Bulvarı Metro Line will serve the Çamlıca Hill, Çamlıca Mosque and Bosna Boulevard and will be connect the M5 metro line. Planned opening date is 2025.

  1. Altunizade (M5 Interchange)
  2. Ferah Mahallesi
  3. Çamlıca Camii
  4. Bosna Bulvarı

Network overview

[edit]

Metro, suburban rail, tram, funicular, ropeway and Metrobus (as of March 2024):

  • In operation: 446.15 km / 351 stations
  • Under construction: 84.5 km / 53 stations
  • Planned: ? km / ? stations
  • Sum: ? km / ? stations
In operation Under construction
(new lines or extensions)
In planning, on hold,
or in revision
Line Length Opening
Date
Length
(km)
Stat. Notes Length
(km)
Stat. Notes Length
(km)
Stat. Notes
Metro Line M1 Yenikapı ↔ Atatürk Airport 3 September 1989 19.9 18 Shared tracks between
Yenikapı ↔ Otogar
Line M1 Yenikapı ↔ Kirazlı 14 June 2013 15.4 13 9.7 9 Kirazlı ↔ Halkalı
Line M2 Yenikapı ↔ Hacıosman 16 September 2000 23.49 16 1.8 km branch
to Seyrantepe
5 Yenikapı ↔ İncirli
5.7 3 Hacıosman ↔ Sarıyer
4 Seyrantepe ↔ Alibeyköy Cep
Line M3 Bakırköy Sahil ↔ Kayaşehir Merkez 14 June 2013 26.7 19
Line M4 Kadıköy ↔ Gökçen Airport 17 August 2012 33.5 23 3 Gökçen Airport ↔ Kurtköy YHT
7.9 6 Tavşantepe ↔ İçmeler 2 İçmeler ↔ Tuzla Marina
Line M5 Üsküdar ↔ Samandıra Merkez 15 December 2017 26.5 20 4.4 3 Samamdıra Merkez ↔ Sultanbeyli 4 Sultanbeyli ↔ Kurtköy YHT
Line M6 Levent ↔ Boğaziçi Üniversitesi 19 April 2015 3.3 4
Line M7 Yıldız ↔ Mahmutbey 28 October 2020 20.0 17 4.5 2 Yıldız ↔ Kabataş 5.4 4 Esenyurt Meydan ↔ Saadetdere
18.1 11 Mahmutbey ↔ Esenyurt Meydan
Line M8 Bostancı ↔ Parseller 6 January 2023 14.27 13
Line M9 Olimpiyat ↔ Ataköy 29 May 2021 17.2 13
M10 (Istanbul Metro) Pendik ↔ Gökçen Airport - 4.9 2 Fevzi Çakmak ↔ Pendik 3 Gökçen Airport ↔ Kurtköy YHT
M11 (Istanbul Metro) Gayrettepe ↔ Arnavutköy Hastane 22 January 2023 51.5 10 17.5 5 Arnavutköy Hastane ↔ Halkalı
M12 (Istanbul Metro) 60. Yıl Parkı ↔ Kazım Karabekir - 13.0 11
M13 (Istanbul Metro) Söğütlüçeşme ↔ Yenidoğan - 24.6 15
M14 (Istanbul Metro) Altunizade ↔ Bosna Bulvarı - 4.5 4
Subtotal: 243.26 158 84.5 53 ? ?
Suburban
Rail
Marmaray Halkalı ↔ Gebze 29 October 2013 76.6 43 operated by TCDD
Halkalı ↔ Bahçeşehir 23 May 2022 13.5 3
Subtotal: 90.1 46
Tramway Line T1 Kabataş ↔ Bağcılar 13 June 1992 19.3 31
Line T2 Taksim ↔ Tünel 29 December 1990 1.6 5 operated by IETT
Line T3 Kadıköy-Moda ring line 1 November 2003 2.6 11
Line T4 Topkapı ↔ Mescid-i Selam 12 September 2007 15.3 22
Line T5 Eminönü ↔ Alibeyköy Cep 1 January 2021 10.1 14
Line T6 Kazlıçeşme ↔ Sirkeci 26 February 2024 8.394 8
Subtotal: 57.294 91
Funicular Line F1 Taksim ↔ Kabataş 30 June 2006 0.6 2
Line F2 Beyoğlu ↔ Karaköy 17 January 1875 0.6 2 operated by IETT
Line F3 Vadistanbul ↔ Seyrantepe 29 October 2017 0.8 2
Line F4 Rumeli Hisarüstü ↔ Aşiyan 28 October 2022 0.8 2
Subtotal: 2.8 8
Ropeway Maçka ↔ Taşkışla 11 April 1993 0.3 2
Eyüp ↔ Pierre Loti 30 November 2005 0.4 2
Subtotal: 0.7 4
BRT Metrobus (Istanbul) TÜYAP ↔ Söğütlüçe��me 17 September 2007 52.0 44 operated by IETT
Subtotal: 52.0 44
TOTAL 446.15 351 84.5 53 ? ?

Network map

[edit]

Map


See also

[edit]

References

[edit]
  1. ^ a b c d e "Lines in Operation" [Rail Systems]. Metro Istanbul. 2022. Retrieved 9 January 2022.
  2. ^ "UYM Metro Istanbul". uym.ibb.gov.tr/ (in Turkish). Retrieved 7 August 2024.
  3. ^ https://t24.com.tr/haber/metro-istanbuldan-logo-degisikligi-aciklamasi,683689 Information on the old 'M' logo and the new 'Metro Istanbul' logo.
  4. ^ "Metro Uzunluğu - Ülkelere ve Şehirlere Göre".
  5. ^ "Cibali-Alibeyköy Cep Otogarı Tramvay Hattı". metro.istanbul. Retrieved 4 January 2021.
  6. ^ "Tunnel". IETT. Archived from the original on 24 July 2018. Retrieved 18 December 2014.
  7. ^ "A brief history of the Underground - London Underground milestones". Transport for London. Retrieved 6 June 2014.
  8. ^ CONSORTIUM DE CONSTANTINOPLE, Bruxelles (French)
  9. ^ "TMMOB: "İstanbul Ulaştırmasının Dünü, Bugünü" (Güngör Evren)" (PDF). Archived from the original (PDF) on 24 September 2015. Retrieved 25 July 2012.
  10. ^ "Yıldız Technical University Faculty of Architecture Magazine (Megaron): "İki Fransız mimarı Henri Prost ve August Perret'nin İstanbul ile ilgili çalışmaları" (Işık Aydemir)" (PDF). Archived from the original (PDF) on 4 March 2016. Retrieved 25 July 2012.
  11. ^ "Europe > Turkey > ISTANBUL Metro". UrbanRail.Net. Retrieved 12 August 2013.
  12. ^ "10 soruda İstanbul Metrosu..." arsiv.ntv.com.tr.
  13. ^ "Istanbul Metropolitan Municipality: "İstanbul Metrosu: Taksim – 4. Levent"". Archived from the original on 26 June 2009.
  14. ^ a b "Istanbul Metropolitan Municipality: Taksim-Yenikapı Metro Hattı". Ibb.gov.tr. 23 January 2002. Archived from the original on 5 May 2009. Retrieved 21 July 2009.
  15. ^ a b "İstanbul Ulaşım: Metro Şişhane'den Maslak'a uzandı". Istanbululasim.com. 30 January 2009. Archived from the original on 14 March 2022. Retrieved 21 July 2009.
  16. ^ "Metro, Şişhane'den Maslak'a uzadı". Istanbul Metropolitan Municipality. 30 January 2009. Retrieved 20 July 2009.
  17. ^ "ist-M.04:02 » M2 Yenikapı-Hacıosman Metro Hattı - Sayfa 11 - Ulaşım Türkiye". istanbululasim.net. Archived from the original on 12 June 2018. Retrieved 2 September 2010.
  18. ^ "Taksim-Yenikapı Metro Hattı". Istanbul Metropolitan Municipality. Archived from the original on 24 April 2009. Retrieved 20 July 2009.
  19. ^ "Anasayfa - Raytürk". Archived from the original on 12 June 2018. Retrieved 18 September 2010.
  20. ^ "METRO İSTANBUL". metro.istanbul.
  21. ^ "Istanbul Metropolitan Municipality: Taksim - 4. Levent metro hattı". Archived from the original on 26 June 2009.
  22. ^ "Istanbul Metropolitan Municipality: Taksim-Ayazağa-Hacıosman metro hattı". Archived from the original on 6 May 2009.
  23. ^ a b "Istanbul Metropolitan Municipality: Taksim-Yenikapı metro hattı". Archived from the original on 24 April 2009.
  24. ^ "Istanbul Metropolitan Municipality: Golden Horn metro bridge". Archived from the original on 13 December 2013.
  25. ^ "FUNİKÜLER SİSTEM Taksim - Kabataş". İstanbul Ulaşım. Archived from the original on 20 August 2008. Retrieved 20 June 2009.
  26. ^ "Kadiköy - Kartal metro opened by Prime Minister". Railway Gazette International. Archived from the original on 19 November 2012. Retrieved 19 August 2012.
  27. ^ İstanbul Büyükşehir Belediyesi. Ibb.gov.tr. Retrieved on 12 August 2013.
  28. ^ "M8 Bostancı-Dudullu Hattı Seferleri Uzatılıyor!". metro.istanbul. Metro Istanbul. Retrieved 9 May 2023.
  29. ^ "İETT Toplu Ulaşım Ücret Tarifesi". iett-istanbul. IETT Istanbul. 13 January 2024. Retrieved 15 April 2024.
  30. ^ "Tickets and Fares". metro.istanbul. Metro Istanbul. Retrieved 5 February 2023.
  31. ^ "Mayor İmamoğlu Announces 24-Hour Public Transport in Istanbul". ibb.istanbul.[permanent dead link]
  32. ^ "Metro İstanbul".
  33. ^ "Metrolarda Gece Seferleri Başladı!". Metro Istanbul. Archived from the original on 1 October 2019. Retrieved 30 July 2023.
  34. ^ "MÜJDE! Kesintisiz ulaşım! İstanbul'da metro 24 saat hizmet verecek - HABERLER". Habertürk (in Turkish). 29 August 2019. Retrieved 29 July 2023.
  35. ^ "Gece Metrosu Yeniden Seferlere Başlıyor!". metro.istanbul (in Turkish). 5 May 2022. Retrieved 1 June 2022.
  36. ^ Metro İstanbul [@metroistanbul] (14 July 2022). "Güzel bir haberimiz var! Gece metrosu hatlarımıza bir yenisini daha ekledik. Artık Cuma'yı Cumartesi'ye, Cumartesi'yi Pazar'a bağlayan gecelerde M7 hattımızda da seferlerimiz 66 saat kesintisiz sürecek! 🎉 https://t.co/K8d6U8qA6V" [We have good news! We have added a new one to our night metro lines. From now on, our flights will continue for 66 hours on our M7 line on the nights connecting Friday to Saturday and Saturday to Sunday! 🎉] (Tweet) (in Turkish). Archived from the original on 14 July 2022. Retrieved 16 January 2023 – via Twitter.
  37. ^ "Istanbul Railway Network Map (complete, including under construction sections)". Istanbul-ulasim.com.tr. İstanbul Ulaşim A.Ş. 2014. Retrieved 13 April 2014.
  38. ^ a b "M1 Yenikapı - Atatürk Havalimanı / Kirazlı Metro Hattı" [M1 Yenikapı - Atatürk Airport / Kirazlı Metro Line]. Istanbul-ulasim.com.tr (in Turkish). İstanbul Ulaşim A.Ş. Archived from the original on 4 March 2016. Retrieved 14 April 2015.
  39. ^ a b c d "Promotional Catalog" [Rail Systems] (PDF). Metro İstanbul. 2021. Retrieved 9 February 2022.
  40. ^ a b "M2 Yenikapı- Hacıosman Metro Hattı" [M2 Yenikapı- Hacıosman Metro Line]. Istanbul-ulasim.com.tr (in Turkish). İstanbul Ulaşım. Archived from the original on 18 October 2015. Retrieved 14 April 2015.
  41. ^ a b "M3 Başakşehir Metro Hattı" [Kirazlı-Başakşehir/Metrokent Metro Line]. Istanbul-ulasim.com.tr (in Turkish). İstanbul Ulaşım. Archived from the original on 8 April 2023. Retrieved 7 April 2023.
  42. ^ a b c "M4 Kadıköy-Sabiha Gökçen Havalimanı Metro Hattı" [M4 Kadikoy-Sabia Gökçen Airport Metro Line]. metro.istanbul/ (in Turkish). Metro İstanbul. Archived from the original on 3 October 2022. Retrieved 7 April 2023.
  43. ^ a b c "M5 Üsküdar-Samandıra Merkez Metro Hattı" [M5 Üsküdar – Çekmeköy Metro Line]. metro.istanbul (in Turkish). Metro Istanbul.
  44. ^ a b c "M6 Levent – Boğaziçi Üniversitesi/Hisarüstü Metro Hattı" [M6 Levent – Boğaziçi Üniversitesi/Hisarüstü Metro Line]. Istanbul-ulasim.com.tr (in Turkish). İstanbul Ulaşım. Archived from the original on 5 March 2016. Retrieved 20 April 2015.
  45. ^ a b c "M7 Mecidiyeköy – Mahmutbey Metro Hattı" [M7 Mecidiyeköy – Mahmutbey Metro Line]. Istanbul-ulasim.com.tr (in Turkish). İstanbul Ulaşım. Retrieved 28 October 2020.
  46. ^ a b c "M8 Bostancı-Dudullu-Parseller Metro Hattı" [M8 Bostancı-Dudullu-Parseller Metro Line]. metro.istanbul (in Turkish). Metro Istanbul. Retrieved 6 January 2023.
  47. ^ a b c "Ataköy-Olimpiyat Metro Hattı" [Ataköy-Olimpiyat Metro Line]. Istanbul-ulasim.com.tr (in Turkish). İstanbul Ulaşım. Archived from the original on 5 June 2021. Retrieved 7 April 2023.
  48. ^ a b c "M11 Gayrettepe – İstanbul Havalimanı Metro Hattı" [M11 Gayrettepe – Istanbul Airport Metro Line] (in Turkish). Retrieved 22 January 2023.
  49. ^ "'U' harfi metroya erişimi kolaylaştırırmış". BirGün (in Turkish). Retrieved 29 July 2023.
  50. ^ "U or M? Metro sign stirs debate in Istanbul". Daily Sabah. 8 September 2021. Retrieved 29 July 2023.
  51. ^ "Üsküdar - Çekmeköy metro hattı asma tavan uygulamaları tamamlandı. - Okro Yapı Sistemleri". okro.com.tr. Archived from the original on 29 July 2023. Retrieved 29 July 2023.
  52. ^ "M1A Hattında 3 İstasyon İşletmeye Kapatılıyor". metro.istanbul. Retrieved 29 July 2023.
  53. ^ İstanbul Büyükşehir Belediyesi. Ibb.gov.tr. Retrieved on 12 August 2013.
  54. ^ "Istanbul Metropolitan Municipality: Taksim-Yenikapı Metro Hattı". Archived from the original on 5 May 2009.
  55. ^ İstanbul Ulaşım: Metro Şişhane'den Maslak'a uzandı
  56. ^ İstanbul Büyükşehir Belediyesi Archived 12 October 2013 at the Wayback Machine. Ibb.gov.tr. Retrieved on 12 August 2013.
  57. ^ https://rayhaber.com/2013/08/126-adet-metro-alimi-ihalesi-icin-en-iyi-teklif-veren-firma-mitsibushi-oldu/ Retrieved on 1 August 2013.
  58. ^ https://rayhaber.com/2016/11/uskudar-cekmekoy-metro-hattinin-yeni-vagonlari-raylara-indi/ Retrieved on 23 November 2016.
  59. ^ a b https://rayhaber.com/2016/03/kabatas-mecidiyekoy-mahmutbey-rayli-ulasim-sistemi-icin-arac-alimi-ihalesini-kazanan-firma-belli-oldu/ Retrieved on 3 March 2016.
  60. ^ Uysal, Onur (16 January 2019). "İstanbul'da hangi metrolar sürücüsüz olacak?". Rail Turkey Tr (in Turkish). Retrieved 29 July 2023.
  61. ^ a b Genel Tanıtım Kataloğu (PDF). Metro Istanbul. 2021. p. 4.
  62. ^ "EBRD co-finances the Istanbul Metro expansion". ebrd.com. Retrieved 12 February 2019.
  63. ^ "Istanbul plans cross-Bosporus metro line". Railway Gazette International. 23 April 2019. Retrieved 8 September 2020.
  64. ^ "İMAMOĞLU: "2029 HEDEFİMİZ 622 KİLOMETRE RAYLI SİSTEM"". ibb.istanbul. Retrieved 8 February 2021.
  65. ^ "Kurumsal". ibb.istanbul. Retrieved 11 March 2023.
  66. ^ "İSTANBULUN METROSU - Raylı Sistemler". istanbulunmetrosu.ibb.gov.tr. Archived from the original on 28 December 2020. Retrieved 12 December 2020.
  67. ^ "Projeler | 150 Günde 150 Proje".
[edit]