Jump to content

Chennai Metro: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
No edit summary
Coolguyche17 (talk | contribs)
m Undid revision 415361888 by 1.39.232.231 (talk)
Line 24: Line 24:
|map =
|map =
}}
}}
The '''Chennai Metro''' ({{lang-ta|சென்னை மெட்ரோ}}) is a [[rapid transit]] system in [[Chennai]], [[Tamil Nadu]], India. The Phase I of the project consisting of two corridors is under construction. The elevated section of the project is scheduled to be operational by 2011 and the entire project is scheduled to be completed by the financial year 2014-2015. About 55% of the corridors in Phase I is underground and the remaining elevated. AFCONS have been awarded, The two project contracts — UAA01 and UAA05 - with value of Rs 1,567 crore and Rs 1,031 crore respectively, Leading contractor in CHENNAI METRO Project.
The '''Chennai Metro''' ({{lang-ta|சென்னை மெட்ரோ}}) is a [[rapid transit]] system in [[Chennai]], [[Tamil Nadu]], India. The Phase I of the project consisting of two corridors is under construction. The elevated section of the project is scheduled to be operational by 2011 and the entire project is scheduled to be completed by the financial year 2014-2015. About 55% of the corridors in Phase I is underground and the remaining elevated.


==Background==
==Background==

Revision as of 22:37, 23 February 2011

Chennai Metro
சென்னை மெட்ரோ
Overview
OwnerChennai Metro Rail Limited(CMRL)[1]
LocaleChennai, India
Transit typeRapid Transit
Number of lines2 (Phase I)
Number of stations41 (Phase I + extension)
HeadquartersSeethammal Road, Alwarpet, Chennai
Websitehttp://www.chennaimetrorail.gov.in/
Operation
Operation will start2013 (Elevated Section on Corridor 2)[2][3][4]
Operator(s)CMRL
Number of vehicles42 (Phase I)
Train length86.5 m
Technical
System lengthTemplate:Km to mi [Phase I + extension]
Track gaugestandard gauge
Electrification25 kV, 50 Hz AC through overhead catenary
Top speed80 km/h (50 mph)

The Chennai Metro (Template:Lang-ta) is a rapid transit system in Chennai, Tamil Nadu, India. The Phase I of the project consisting of two corridors is under construction. The elevated section of the project is scheduled to be operational by 2011 and the entire project is scheduled to be completed by the financial year 2014-2015. About 55% of the corridors in Phase I is underground and the remaining elevated.

Background

Chennai is the 3rd largest metropolitan city in India. Chennai often known as the Detroit of Asia is widely known for its presence in the automotive industry and has attracted several global automakers to setup their factories in the city becoming one of the global leaders in the industry. Apart from automobiles, it also has development centres set up by many software companies which contributed 14% of India's total software exports of 144,214 crore (US$17 billion) during 2006–07, making it the second-largest exporter of software in the country, behind Bangalore. Based on all these industrial and technological advancements, urban population has risen rapidly, requiring need for faster and safer transportation at all times. The city already has multiple modes of transportation. A bus system is run by the Chennai MTC and is augmented by the Chennai suburban railway network run by the Southern Railway. In addition to this, the Chennai Corporation has also implemented the Chennai MRTS project, an elevated railway system was sanctioned in 1984 to ease congestion in central Chennai. However, traffic congestion was still a big problem for both the citizens as well as the City's governing body. Hence, the Chennai Corporation has decided to implement the Chennai Metro project which will be another alternate transportation mode to a metropolis like Chennai.

History

After the success of the Delhi metro, a similar system was mooted for the city of Chennai by E. Sreedharan of the DMRC to the Tamil Nadu CM J. Jayalalitha.[5] The plan was later dropped in favour of a highly ambitious monorail network, spread over the whole city.[6] After being voted out of power soon after, the new CM M. Karunanidhi revived the metro rail project to life once again.

The Metro rail project was included in the 2007-08 State Government's budget, and an amount of 50 crores had been sanctioned for preliminary works which included a Detailed Project Report (DPR) to be prepared by the DMRCRail Project. The approval for the project was finally given by the state cabinet on 7 November 2007[7] and is to be executed by a Special purpose vehicle, the Chennai Metro Rail Limited (CMRL).

Corridors

Master Plan prepared by DMRC

A Total of 7 lines have been planned by the DMRC for Chennai Metro Rail Project.[8]

Line Termini Opening Date Length
(km)
Underground
(km)
Underground
stations
Elevated
stations
Interchange
Line 1 Tiruvottiyur Chennai International Airport 2014 32.1 14.3 11 6 Suburban, MRTS, 2
Line 2 Chennai Central St. Thomas Mount 2013 22 9.7 9 8 Suburban, MRTS, 1
Line 3 Mogappair Tiruvanmiyur 4, MRTS
Line 4 Porur Kamarajar Salai 3
Line 5 Ring Road Ring Road
Line 6 Radhakrishnan Salai Kilpauk Medical College 2
Line 7 Along NH5 Road Along NH5 Road

Corridors proposed in CTS

Two corridors have been proposed in the comprehensive transportation study recently submitted by Wilbur Smith Associates.[9]

Corridor 1: MedavakkamSt. Thomas Mount

Corridor 2: MadhavaramLighthouse via Radhakrishnan Salai

Corridors proposed by CMRL

A metro line from ThiruvanmiyurKottivakkam and beyond via ECR has been proposed by CMRL in the steering committee meeting of the department of Highways and Minor Ports. But it has been decided to defer it for present and take it up later. This was proposed as an alternate for the East Coast Elevated Expressway[10]

Projects in Study

A project study would be taken up to establish links between Moolakadai--Thirumangalam, Moolakadai--Thiruvanmiyur and Luz--Poonamallee through Iyyappanthangal.http://www.thehindu.com/news/cities/Chennai/article1078733.ece

Others

Apart from these, there are demands to extend the Metro Rail to Tambaram.[11]. State Government is considering extension to Tambaram.[12]

Proposed MRTS take-over by CMRL

The MRTS, operated by Southern Railway, is proposed to be taken over by the CMRL thereby bringing all the elevated tracks and underground tracks inside the city under one organization. The Chennai MRTS is a very poorly executed project and is a loss making enterprise at present. After the merger, it is proposed to replace the current EMUs in the MRTS with air-conditioned coaches with automatic doors.[13]

Phase I

According to the Detailed project report submitted by the DMRC, there are two lines planned:

Line Termini Opening Date Length
(km)
Underground
(km)
Underground
stations
Elevated
stations
Rakes # of Coaches Interchange
Line 1 Washermanpet Chennai International Airport 2014 23.1 14.3 11 6 23 92 Suburban, MRTS, 2
Line 1 Extension Wimco Nagar Washermanpet 2015 9 2.3 1 6 North, West North, West South
Line 2 Chennai Central St. Thomas Mount 2013 22 9.7 9 8 23 92 Suburban, MRTS, 1
  • The Corridor 1 is being extended from Washermapet to Thiruvottiyur as it was originally planned. A detailed investigation is being under taken by the announcement of Governor of Tamil Nadu.[14]
  • DMRC conducts soil tests in Thiruvottiyur areas for Metro extension.

Cost

The project is estimated to cost around 14,600 crore (US$1.7 billion) for the two corridors totaling 45 km. However, the previous estimate in 2007 was 9,565 crore (US$1.1 billion).[15] But it is likely to increase by 23% to 18,000 crore (US$2.2 billion)[16] The Underground tunneling will cost about Rs 300 crores per km, whereas Elevated track will cost about Rs 100 crores per km. The estimated construction cost of Underground and Elevated Station will be Rs 100 crores and Rs 30 crores respectively.[17]

Finance

The central government has agreed to partly finance the project, similar to the aid extended to the Bangalore metro and Hyderabad Metro.[18] This is in addition to the funds provided by the state government. The JBIC is also expected to fund the project.

Stations

A total of 32 stations have been planned along the two corridors. As many as 19 stations are underground and 12 are elevated. Of these, the Chennai Central (Underground) and Alandur (Elevated) are common for both the corridors and serve as interchange stations.

Corridor 1

Underground Stations (12):Sathiyamoorthy Nagar,Tiruvottiyur, Washermanpet, Mannadi, High Court, Chennai Central, Tamil Nadu Legislative Assembly, LIC, Thousand Lights, Gemini, Teynampet, and Saidapet

Elevated Stations (6): Little Mount, Guindy, Alandur, Officer's Training Academy, Meenambakkam and Chennai International Airport.

Corridor 2

Underground Stations (9): Chennai Central (Interchange), Egmore, Nehru Park, Kilpauk Medical College, Pachaiyappa's College, Shenoy Nagar, Anna Nagar East, Anna Nagar Tower and Tirumangalam.

Elevated Stations (8): Koyambedu, CMBT, Arumbakkam, Vadapalani, Ashok Nagar-KK Nagar, SIDCO, Alandur (Interchange) and St. Thomas Mount (Parangimalai)

Inter Modal transit facilities

The metro corridors would provide connection with various other transport systems in the city:

Construction

The construction started on 10 June 2009 with the piling work for the elevated viaduct between Koyambedu and Ashok Nagar strech. Complete construction is expected to be fully completed by February 2015. The first section to be opened will be on Line 2 between Koyambedu and St. Thomas Mount and this stretch would be in operation by 2013.

Contracts Awarded so far for construction:[19]

S.No Name of the Firm Date of Award Contract Value ( Crores) Details
1
Soma Enterprise Limited (SEL)
13.02.09
194.20
Design and construction of elevated viaduct from Koyambedu to Ashok Nagar
2
Larsen & Toubro Limited (L&T)
12.01.2010
141.13
Design and construction of elevated viaduct including viaduct at stations from Ashok Nagar to St. Thomas Mount
3
Larsen & Toubro Limited (L&T)
25.01.2010
173.30
Design and construction of elevated viaduct including viaduct at stations from Saidapet to Officers Training Academy (OTA).
4
Tantia Construction Limited (TCL)
19.04.10
20.52
Prefilling of Koyambedu Depot
5
Consolidated Construction Consortium Limited (CCCL)
22.06.10
139.54
Design and construction of five elevated stations - Koyambedu, CMBT, Arumbakkam, Vadapalani and Ashok Nagar/K.K.Nagar
6
Consolidated Construction Consortium Limited (CCCL)
22.06.10
94.99
Design and construction of five elevated stations - Little Mount, Guindy, Alandur, OTA and SIDCO
7
Alstom Transport S.A & Alstom Projects India Ltd Consortium
02.08.10
1471.38
Design, Manufacture, Supply, Testing and Commissioning of Electric Multiple Units (EMUs) and Training of Personnel

Fare Structure (2013 - 2014)

Distance (km) Metro Fare ()
0 - 2 8.00
2 - 4 10.00
4 - 6 11.00
6 - 9 14.00
9 - 12 15.00
12 - 15 17.00
15 - 18 18.00
18 - 21 19.00
21 - 24 20.00
24 - 27 22.00
>27 23.00

Phase II


Three lines covering a distance of 63 km[20] have been proposed in Phase II. Detailed project report is to be prepared in a year.[21][22][23]

Line 3 [19 km]

Moolakadai — Perambur — Kilpauk — Thousand Lights — Mylapore — Thiruvanmiyur

Line 4 [22 km]

Moolakadai — Redhills — Ambattur — Mogappair — Thirumangalam

Line 5 [22 km]

Mylapore — Luz — Teynampet — T Nagar — Vadapalani — Saligramam — Iyyapanthangal — Poonamallee

Timeline

2008

  • 16 April: Planning commission gives in-principle approval for the project[24]
  • 21 November: Deal signed with Japan Banking Corporation for procuring 59% loan at Tokyo.[25]

2009

  • 20 January: Tenders floated for Phase I of the Metro project; winning bidder yet to be announced, work to commence in the end of February or beginning of March.
  • 29 January: Chennai Metro becomes one of the fastest projects to get approval from the Economic Ministry, signed for commencement by officiating Finance Minister Mr. Pranab Mukherjee.
  • 19 February: The Hyderabad-based Soma Enterprise Ltd has been awarded a INR 199.2-crore (INR 1.99 billion) contract in the Chennai Metro Rail Project, marking the start of the work on the project. It has begun construction on the 4.5 km stretch elevated viaduct along the IRR (Inner Ring Road) between Koyambedu and Ashok Nagar. It does not include stations as it would be tendered separately.[26]
  • 10 March: A Five-member consortium led by Egis Rail S.A, France has been awarded the USD 30 million general consultancy contract by CMRL. The other members of the consortium are Egis India Consulting Engineers Private Ltd., India, Maunsell Consultants Asia Ltd., Hong Kong, Balaji Rail Road Systems Ltd., India and Yachiyo Engineering Co. Ltd., Japan.[27]
  • 20 May: CMRL started to evaluate the integration of Metro corridor with the planned grade separator at the junction of Arcot Road and Jawaharlal Nehru Road.[28]
  • 27 May: Trial Pile Load Tests are being conducted at three locations in Inner Ring Road (IRR) — At Ashok Nagar opposite to Karaikudi Restaurant, at vadapalani opposite to Hotel Ambica Palace Empire and at Koyambedu opposite to SAF Games Village.[29]
  • 10 June: Deputy Chief Minister of Tamil Nadu Thiru. M.K.Stalin inaugurated the piling work for the construction of elevated viaduct from Koyambedu to Ashok Nagar.[30]
  • 23 July: Pre-qualification tenders invited by EMBYE consultant for the rolling stock.[31]
  • 30 July: Soil tests conducted by DMRC at Wimco Nagar, Periyar Nagar and Neydhal Nagar in Tiruvottiyur for Chennai Metro Extension.
  • 26 August: Tenders invited for the elevated viaducts for the Corridor 1 from Saidapet including station viaducts till OTA and for Corridor 2 from Ashok Nagar including station viaducts till Alandur.[32]
  • 4 September: Pre-qualification tenders invited for underground stations and tunnels. Invite for bids are expected around January 2010.
  • 31 December: Pre-qualification tenders invited for track works (design and build). Invite for bids are expected around May 2010.

2010

  • 11 January: Pre-qualification tenders invited for power supply system and overhead equipment (design and build). Invite for bids are expected around May 2010.
  • 28 January: Larsen and Toubro (L&T) bags the contract for 9.73 elevated viaducts from Corridor 1 from Saidapet till OTA (5.17 km @ INR 173.30 crores) and for Corridor 2 from Ashok Nagar till St.Thomas Mount (4.56 km @ INR 141.13 crores) valued together at INR 314.43 crores.[33][34][35]
  • 12 February: Tenders invited for 10 elevated stations and an integrated viaduct-flyover @ vadapalani.
  • 12 March: Tender invited for Koyambedu Depot pre-filling and two PQs invited for Telecom, Platform Screen Doors & Signalling and Lifts & Escalators.
  • 29 March: Chennai Metro Project Phase II receives INR 2,932.6 Crores loan agreement from Japan. Finance Ministry of India signs agreement with Japanese Ambassador to India Hideaki Domichi.[36][37]
  • 19 April: Tender for pre-filling of Koyambedu depot has been awarded to Tantia Construction Limited.[38]
  • 22 June: Tenders for 10 elevated stations have been awarded. 5 stations in - Koyambedu, CMBT, Arumbakkam, Vadapalani and Ashok Nagar/K.K Nagar as 1 package at a cost of 139.54 crores and another 5 in Little Mount, Guindy, Alandur, O.T.A., and SIDCO as another package at a cost of 94.99 crores have been awarded to Consolidated Construction Consortium Limited.[39][40][41]
  • 29 June: Works on Underground sections, underground stations, signaling and telecom, tracks, OHE, etc would begin before the end of 2010-2011 financial year.[42]
  • 2 August: Rolling stock tenders have been awarded to Alstom Transport S.A & Alstom Projects India Ltd consortium at a cost of INR 1471.3 crores. 42 train-sets of 4-car configuration (168 coaches) is to be procured.[43] The first delivery of cars is expected to reach by end of 2012. The train sets will be equipped with air-conditioned interiors, electrically operated automatic sliding doors, regenerative braking system.[44][45]
  • 19 August: Phase-I extension will have 2.3 km underground and 6.6 km elevated with 7 stations.[46]
  • 30 October: Metro rail extension to Tambaram would be considered.[47]
  • 2 November: Depot work for Phase I has been awarded to L&T.[48][49]

1feb2011: AFCONS bags, two project contracts — UAA01 and UAA05 - with value of Rs 1,567 crore and Rs 1,031 crore respectively, A Major Contractor in CHENNAI METRO.

See also

References

  1. ^ "Home Page of Chennai Metro Rail Limited". Chennaimetrorail.gov.in. Retrieved 16 August 2010.
  2. ^ http://chennaimetrorail.gov.in/press_clippings/PIC20.jpg
  3. ^ http://chennaimetrorail.gov.in/press_clippings/PIC19.jpg
  4. ^ http://chennaimetrorail.gov.in/press_clippings/PIC21.jpg
  5. ^ "Metro rail for Chennai". Hinduonnet.com. 22 August 2003. Retrieved 20 August 2010.
  6. ^ "Monorail project: To cover 300 km in 18 corridors". Thehindubusinessline.com. 3 February 2006. Retrieved 20 August 2010.
  7. ^ "TN to float SPV for Rs 9,757cr Chennai metro". Business-standard.com. 7 November 2007. Retrieved 20 August 2010. [dead link]
  8. ^ http://www.chennaimetrorail.gov.in/tenders/project_brief_updated_aug08.pdf
  9. ^ "Front Page : Big plans for transport infrastructure for Chennai". Chennai, India: The Hindu. 28 February 2010. Retrieved 16 August 2010.
  10. ^ A. Srivathsan (18 July 2010). "Cities / Chennai : Metro Rail along ECR deferred". The Hindu. Retrieved 16 August 2010.
  11. ^ August 16th, 2010 DC Correspondent. "Baalu for extension of Metro to Tambaram | Deccan Chronicle | 2010-08-16". Deccan Chronicle. Retrieved 16 August 2010. {{cite web}}: |author= has generic name (help)CS1 maint: numeric names: authors list (link)
  12. ^ "Government to consider extension of Metro Rail". The Hindu. Chennai, India. 30 October 2010.
  13. ^ Ajai Sreevatsan (6 August 2010). "Cities / Chennai : Metro Rail may take over MRTS". The Hindu. Retrieved 16 August 2010.
  14. ^ "Front Page : Metro Rail may cover Tiruvottiyur". Chennai, India: The Hindu. 22 January 2009. Retrieved 16 August 2010.
  15. ^ "Chennai Metro back on track". Hinduonnet.com. 22 August 2006. Retrieved 20 August 2010.
  16. ^ http://sify.com/finance/chennai-metro-project-cost-likely-to-rise-23-news-equity-kj3mO9aiada.html
  17. ^ "Cost of Track & Station". Times of India. 14 September 2010. Retrieved 20 August 2010.
  18. ^ "Metro rail: State to get Central aid". Chennai, India: Hindu.com. 11 November 2007. Retrieved 20 August 2010.
  19. ^ Alstom Transport (29 January 2010) (29 January 2010). "Metro Rail contracts awarded". The Hindu. Chennai, India. Retrieved 18 September 2010.{{cite news}}: CS1 maint: numeric names: authors list (link)
  20. ^ http://www.hindu.com/2011/01/29/stories/2011012957230100.htm
  21. ^ http://epaper.timesofindia.com/Default/Scripting/ArticleWin.asp?From=Archive&Source=Page&Skin=TOINEW&BaseHref=TOICH/2011/01/08&PageLabel=2&EntityId=Ar00200&ViewMode=HTML&GZ=T
  22. ^ http://epaper.timesofindia.com/Default/Scripting/ArticleWin.asp?From=Archive&Source=Page&Skin=TOINEW&BaseHref=TOICH/2011/01/08&PageLabel=2&EntityId=Ar00203&ViewMode=HTML&GZ=T
  23. ^ http://www.hindu.com/2011/01/08/stories/2011010852780400.htm
  24. ^ TNN, Apr 16, 2008, 09.00am IST (16 April 2008). "Center nod for Metro Rail in Chennai". Timesofindia.indiatimes.com. Retrieved 20 August 2010.{{cite news}}: CS1 maint: multiple names: authors list (link) CS1 maint: numeric names: authors list (link)
  25. ^ "Home Page of Chennai Metro Rail Limited". Chennaimetrorail.gov.in. Retrieved 16 August 2010.
  26. ^ "Soma Enterprise bags Chennai Metro Rail order". The Hindu Business Line. Retrieved 16 August 2010.
  27. ^ Egis Rail India. "USD 30 million contract by CMRL". The Times Of India. Retrieved 10 March 2009. {{cite news}}: Unknown parameter |coauthors= ignored (|author= suggested) (help)
  28. ^ "Tamil Nadu / Chennai News : Ball set rolling on Vadapalani flyover". Chennai, India: The Hindu. 20 May 2009. Retrieved 16 August 2010.
  29. ^ [1][dead link]
  30. ^ http://www.chennaimetrorail.gov.in/press_releases/pre4.pdf
  31. ^ "Chennai Metro to invite bids for passenger EMUs". Projectstoday.com. 25 July 2009. Retrieved 16 August 2010.
  32. ^ "CMRL invites bids for construction of elevated viaducts". Projectstoday.com. 25 August 2009. Retrieved 16 August 2010.
  33. ^ http://www.chennaimetrorail.gov.in/press_releases/pre6.pdf
  34. ^ "The Hindu Business Line : L&T bags two Chennai Metro Rail tenders". Blonnet.com. 29 January 2010. Retrieved 16 August 2010.
  35. ^ "Chennai". Times Chennai. Retrieved 16 August 2010.
  36. ^ PTI, Mar 29, 2010, 01.19pm IST (29 March 2010). "Japan commits Rs10535cr towards six infra projects in India - India - The Times of India". Timesofindia.indiatimes.com. Retrieved 16 August 2010.{{cite news}}: CS1 maint: multiple names: authors list (link) CS1 maint: numeric names: authors list (link)
  37. ^ Special Correspondent (29 March 2010). "The Hindu : Business News : Japan credit for six infrastructure projects". Beta.thehindu.com. Retrieved 16 August 2010. {{cite web}}: |author= has generic name (help)
  38. ^ http://chennaimetrorail.gov.in/CMRLTendersawarded.pdf
  39. ^ http://chennaimetrorail.gov.in/press_clippings/PIC25.jpg
  40. ^ TNN, Jun 29, 2010, 01.25am IST (29 June 2010). "Elevated metro stations to come up at 10 places - Chennai - City - The Times of India". Timesofindia.indiatimes.com. Retrieved 16 August 2010.{{cite news}}: CS1 maint: multiple names: authors list (link) CS1 maint: numeric names: authors list (link)
  41. ^ Special Correspondent (29 June 2010). "Cities / Chennai : Tenders awarded for 10 Metro Rail stations". The Hindu. Retrieved 16 August 2010. {{cite web}}: |author= has generic name (help)
  42. ^ http://chennaimetrorail.gov.in/press_clippings/PIC24.jpg
  43. ^ http://chennaimetrorail.gov.in/press_releases/pre11.pdf
  44. ^ Financial Express (11 September 2010). "Alstom to provide 168 cars for Chennai's metro". Retrieved 18 September 2010.{{cite web}}: CS1 maint: numeric names: authors list (link)
  45. ^ Alstom Transport (09 September 2010). "First Metro Rolling Stock contract in India". Retrieved 18 September 2010.{{cite web}}: CS1 maint: numeric names: authors list (link)
  46. ^ Ajai Sreevatsan. "Cities / Chennai : Metro Rail set to be extended to Tiruvottiyur". The Hindu. Retrieved 20 August 2010.
  47. ^ "Government to consider extension of Metro Rail". The Hindu. Chennai, India. 30 October 2010.
  48. ^ http://www.chennaimetrorail.gov.in/CMRLTendersawarded.pdf
  49. ^ http://economictimes.indiatimes.com/news/news-by-industry/indl-goods-/-svs/engineering/LT-awarded-construction-of-Metro-Rail-depot-works/articleshow/7107356.cms